C.T. Brayton & Sons, Inc

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Site Clearing and Demolition, Painting, Graffiti Resistant Coatings, Electrical, Earthwork, Concrete Paving, Fencing, Landscape and Irrigation, Track Surfacing, Storm Drainage Utilities.


PROJECT NAME:

MUSD Lathrop High School Track Renovations Re-Bid

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Manteca Unified School District

PROJECT LOCATION:

647 Spartan Way, Lathrop, CA, 95330

BID DUE DATE:

11-05-2024 at 02:00 PM

OUTREACH COORDINATOR:

Pam Galbreath

TELEPHONE:

209-838-7388

FAX:

209-838-3960

ADDRESS:

1804 Jackson Ave, Escalon, CA, 95320

PROJECT DETAILS:

DESCRIPTION: Lease Leaseback Project. Seeking Subcontractor Bids Only. 

Scope of work to include, but not be limited to, the following:

Site demolition, clear and grub of existing natural grass field, followed by renovation of natural turf field with new irrigation and goal posts. Existing DG track to be replaced with new asphalt all-weather track surfacing for 400-meter, 8 lane running track. New NFHS field events to be constructed including new discus cage, shot put, long jump, triple jump, and pole vault. Installation of associated hardscape, fencing, landscape, site utilities, electrical infrastructure for pathway lighting, and path of travel and upgrades to existing restroom / concession building for accessibility requirements. Loose site furnishings are to be provided, including but not limited to, hurdles, pads, soccer goals, soccer corner flags, high jump and pole vault standards and landing pads, & track crossing mats. 

MEP Prequalification Requirements: 

All electrical, mechanical and plumbing contractors shall be prequalified with the District pursuant to Education Code section 17406 subsection (a)(2)(C), and Public Contract Code section 20111.6 subsections (b) through (m), prior to Contractor’s submission of its proposal.   MEP subcontractors submitting proposals shall complete the prequalification process at least 5 days prior to bid date. 

https://pqbids.com/manteca-unified-school-district/

Pre-bid Job Walk (Non-Mandatory):  
Tuesday, October 15, 2024, at 10:00 AM at Lathrop High School. Meet in parking lot on Dos Reis Rd. (North of the stadium). 

Engineers Estimate: $5 M.          

Plans and Specs: Plans and Specs can be reviewed at the local Builders Exchanges or on the CTB website at www.ctbrayton.com under bidding.

Insurance Requirements: All Bidders must review insurance requirements and include any additional costs in their cost proposals.

RFI’s:  Please submit all questions and RFI’s to our office at 209-838-3960 (fax) or email estimator@ctbrayton.com. All RFI’s must be submitted No later than Monday, October 28, 2024.

PLEASE INCLUDE YOUR DIR REGISTRATION NUMBER AND CONFIRM YOU CAN MEET SKILLED AND TRAINED WORKFORCE REQUIREMENTS WHEN SUBMITTING BID.

 DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.

a.         All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and

b.         Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.

 Skilled and Trained Workforce Requirements:

All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project. 

 Subcontractor Selection: Subcontracts will be awarded on basis of “Best Value” using the following scoring criteria:

Pass/Fail – The following items are mandatory. If a subcontractor cannot meet these requirements their bid will be considered NON-RESPONSIVE and excluded from consideration:

            • Labor Requirements of AB566 / DIR

            • Insurance Requirements

Scoring – The following items will be graded on a point basis as indicated. Higher scores indicate a higher level of compliance in the opinion of the scorer. Scorers will be chosen to represent the Owner, Architect, and C.T. Brayton & Sons, Inc. The Subcontractor with the highest score will be considered as “Best Value” and awarded a subcontract accordingly.

            • 15 Points Price

            • 10 Points Similar Projects

            • 7 Points Safety

            • 6 Points Bonding

            • 6 Points Local Business Participation

            • 6 Points Manpower / Capacity of contractor to perform.

            • 50 points Maximum Possible Score per Scorer.

All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.

 This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.