Conan Construction, Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Cast-in-Place Concrete, Polished Concrete, Structural Steel Framing, Decorative Metal, Rough Carpentry, Wood I-Joists, Casework, Simulated Stone Fabrications, Plastic Paneling, Crystalline Waterproofing, Thermal Insulation, Weather Barriers, Standing Seam Metal Roof Panels, Built-up Asphalt Roofing, Sheet Metal Flashing and Trim, Self-Adhering Sheet Flashing, Joint Sealants, Firestopping, Metal Doors and Frames, Wood Doors, Access Doors and Panels, Rolling Counter Shutters, Aluminum-Framed Storefronts, Door Hardware, Glazing, Louvers, Gypsum Board Assemblies, Portland Cement Plastering, Tiling, Acoustical Ceilings, Linear Wood Ceilings, Resilient Flooring, Painting and Coating, Graffiti-Resistant Coatings, Marker Boards, Tackboards, Signage, Toilet Compartments, Cubicle Curtains and Track, Toilet Accessories, Fire Protection Specialties, Metal Storage Shelving, Flagpoles, Projection Screens, Window Shades, Electric Traction Elevators, Basic Fire Suppression Requirements, Through Penetration Firestopping, Fire suppression Supports and Anchors, Seismic Requirements for Equipment and Supports, Fire Suppression ID, Fire Protection Systems, Plumbing, HVAC, Electrical, Interior and Exterior Communication Pathways, Communication Equipment Rooms, backbone Cabling Requirements, Horizontal Cabling Requirements, testing, Structured Cabling System Warranty, Audio/Video System, Integrated Communications System, Wireless Clock System, Electronic Safety and Security, Intrusion Detection System, Video Surveillance, Rescue Assistance Communication, Fire Alarm and Detection Systems, Site Clearing, Earth Moving, Asphalt Paving, Concrete Paving, Joint Sealants, Synthetic Grass, Chain Link Fences and Gates, Irrigation, Soil Preparation, Planting, Sanitary Sewerage.


PROJECT NAME:

Sweetwater Union School District – Castle Park High School Building & Site Improvements

BID CONTRACT #:

25-2924-JG

AWARDING AGENCY:

Sweetwater Unified School District

PROJECT LOCATION:

1395 Hilltop Drive, Chula Vista, CA, 91911

BID DUE DATE:

10-22-2024 at 02:00 PM

OUTREACH COORDINATOR:

Bree

TELEPHONE:

7605121188

FAX:

NA

ADDRESS:

2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010

PROJECT DETAILS:

Project Details:

  • Project Name: Castle Park High School Building & Site Improvements
  • Project Address: 1395 Hilltop Drive, Chula Vista, CA 91911
  • Owner/District: Sweetwater Union School District
  • Architect: HED
  • Job Walk: A pre-bid conference and site visit will be held on 09/24/2024 or 10/01/2024 at 11:00 am at Castle Park High School, 1395 Hilltop Drive, Chula Vista, CA 91911. All participants are required to sign in and meet at the Administration Building. Failure to attend or tardiness will render bid ineligible. The walk is mandatory only for Prime contractors. 

Encouraging DVBE, WBE, MBE, DBE, and SB Subcontractors & Suppliers to bid.

MANDATORY REQUIREMENTS:

  • All Contractors and Subcontractors must be registered with the Department of Industrial Relations (DIR) at Bid Time.
  • Prevailing Wage Project.
  • Project Labor Agreement - The District has entered into a Project Labor Agreement (PLA) that is applicable to this Project. The PLA is available for reference at the following link: https://facilities.sweetwaterschools.org/pla/ which includes the Letter of Assent.

SUBCONTRACTOR PREQUALIFICATION:

  • Subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, must be prequalified with SUHSD. The prequalification application is available at the SUHSD Purchasing Website, under the Contractor Prequalification tab.  For more information, please reference the Invitation to Bidders in the link above. 

PROJECT DESCRIPTION:

  • Site modernization of an existing High School campus, with demolition of select buildings and existing site work. 
  • New work includes construction of a two-story classroom building (900), 
  • New site work includes Installation of hardscape, landscape and artificial turn, (5) PC-approved shade structure, platform, new walking ramp to the right of way, PV battery storage cabinet. 