Trade Journal

ProWest Constructors

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide SWPPP, final clean, survey, demolition, hazardous material handling, reinforcing steel, cast-in-place concrete, sealed/polished concrete, masonry, structural steel, metal deck, handrails and railings, rough carpentry, finish carpentry, cabinets, FRP, waterproofing, insulation, VETM, roofing, sheet metal flashing and trim, metal siding, composite wall cladding, expansion control systems, doors, overhead doors, glass, storefronts, drywall, lath and plaster, ceramic tile, acoustical ceilings, carpet, resilient flooring, wall covering, acoustical treatment, painting, visual display boards, signage, toilet partitions, bathroom accessories, operable partitions, wire mesh partitions, wall and corner guards, fire extinguishers, lockers, metal shelving, coat rack systems, awnings and canopies, flagpoles, food service equipment, projection screens, stage curtains, playground equipment, window coverings, site furnishings, shade structures, wheelchair lifts, fire sprinklers, plumbing, HVAC, HVAC controls, electrical, EV charging system, communications, audio visual, fire alarm, intrusion detection, earthwork, AC paving, site concrete, synthetic grass, fences and gates, landscaping, athletic surfacing, site utilities, photovoltaic system


PROJECT NAME:

Chesterton Elementary School Whole Site Rebuild

BID CONTRACT #:

CC25-0309-52-00

AWARDING AGENCY:

San Diego Unified School District

PROJECT LOCATION:

7335 Wheatley St., San Diego, CA, 92111

BID DUE DATE:

11-13-2024 at 01:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

The Whole Site Rebuild Project consists of the demolition of all permanent buildings and the removal of the portable classrooms.

In their place, five new buildings will be constructed as described: Building #10: New Administration Building; Building #20:

Multipurpose/Food Service Building; Building #30: Classroom Building for Grades 3-5; Building #40: Classroom Buildings for

UTK & Kindergarten; and Building #50: Classroom Building for 1st & 2nd Grades, and a Learning Common Space.

The total gross square footage of the new buildings will be approximately 61,392 square feet, comprising 25 classrooms and 3

collaborative spaces, accommodating a maximum capacity of 611 students.

Site improvements will include regrading, the removal of existing utilities, and the installation of all new wet and dry utilities.

Additionally, a new transformer will be installed, along with site drainage and stormwater management improvements, new

parking areas, drop-off zones, play equipment, and new delivery and trash pick-up areas.

Deferred Approval Items The subcontractors will be responsible for completing design and obtaining DSA approval for the

following deferred approval items: (i) Roof Trusses; (ii) Shade Canopies [6 Total]; (iii) PV System (Design Build).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.