Trade Journal

Hazard Construction Engr LLC

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide SHORING, TRAFFIC CONTROL, DEWATERING, EROSION CONTROL, CLEAR & GRUB, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, ROCK MULCH, ROCK COBBLE, FULL CAPTURE SYSTEM, CHOKER LAYER, RESERVOIR LAYER, BIORETENTION SOIL MEDIA, LANDCAPING, PLANTING, IRRIGATION, HMA, CLASS II BASE, COLD PLANE AC, STRUCTURAL CONCRETE, MINOR CONCRETE, ROCK SLOPE PROTECTION, SIGNAGE, STRIPING & MARKERS


PROJECT NAME:

South Mission Road (North Segment) Project 1 Green Street

BID CONTRACT #:

Oracle Project No. 1026868; RFB 1151

AWARDING AGENCY:

County of San Diego

PROJECT LOCATION:

South Mission Road, Fallbrook, CA, 92028

BID DUE DATE:

11-04-2024 at 02:00 PM

OUTREACH COORDINATOR:

Amanda Redmond

TELEPHONE:

858-587-3600

FAX:

858-453-6034

ADDRESS:

10529 Vine Street, Lakeside, CA, 92040

PROJECT DETAILS:

Hazard Construction Engr LLC is seeking qualified and certified DVBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below.  A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room or download at the agency’s website: 

https://sdbuynet.sandiegocounty.gov

*** THIS IS A PREVAILING WAGE PROJECT ***

IMPORTANT!  We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount.  Hazard will compensate for up to 3% for the required Bonds.

 

Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company’s Insurance Requirements for General Liability, Auto and Workers’ Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf

 

Please note that the requirements of SB 854 became effective on March 1, 2015.  From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIRNo Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor’s legal name or license number  https://efiling.dir.ca.gov/PWCR/Search.action

­­­

Social Media

Copyright © 2024 Compliance News All rights reserved.