is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Concrete, Polished Concrete Finishing, Concrete Unit Masonry, Metal Fabrications, Structural Steel Framing, Cold-Formed Metal Framing, Metal Stairs & Railings, Wood Framing, Finish Carpentry, Casework and Countertops, FRP Paneling, Dampproofing/Waterproofing, Thermal & Acoustic Insulation, Polyvinyl-Chloride (PVC) Roofing, Flashing and Sheet Metal, Doors, Frames, and Hardware, Hydraulic Bi Fold Doors, Aluminum-Framed Entrances and, Storefronts, Glass & Glazing, Lath & Plaster, Gypsum Board Assemblies, Tiling, Acoustical, Ceilings, Resilient Wood Flooring Assemblies, Resilient Base and Accessories, Acoustical, Panels, Painting and Coating, Markerboards, Signage, Illuminated Marquee Sign, Cubicle, Curtains and Track, Toilet Accessories & Fire Protection Specialties, Metal Storage Shelving, Flagpoles, Platform Curtain, Electrical Window Shades, Fire Supression, Plumbing, Heating, Ventilating, and Air Conditioning (HVAC), Testing, Adjusting, and Balancing of HVAC, Direct-Digital Control System for HVAC, Electrical , Communications, Audio-Video Systems, Fire Alarm & Intrusion Detection, Earthwork & Grading, Termite Control, Asphalt Paving, Pavement Markings & Accessories, Decorative Metal Fences and Gates, Landscaping, Site Utilities
MAR VISTA ACADEMY BUILDING & SITE IMPROVEMENTS
24-2911-JG
Sweetwater Union High School District
1267 Thermal Ave, San Diego, CA, 92154
11-13-2024 at 02:00 PM
Maranda Maliska
619-784-2704
805-614-9909
991 Bennett Avenue, Arroyo Grande, CA, 93420
PROJECT DETAILS:
Edwards Construction Group is currently pursuing the Mar Vista Academy Building & Site Improvements project for Sweetwater Union High School District.
SCOPE OF WORK:
Est Construction Budget: $13,750,000
Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project.
This is a PREVAILING WAGE project.
There is a 3% DVBE Participation requirement.
There is a MEP Subcontractor Prequalification requirement. Subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered. The Prequalification application is available at the SUHSD Purchasing Website, under the Contractor Prequalification tab -AND- provided in Exhibit A of the bid documents attached. Contractor Pre-Qualification are due to Purchasing: October 29th, 2024 by 2:00 p.m.
There is a PROJECT STABILIZATION AGREEMENT
(https://facilities.sweetwaterschools.org/pla/)
BID DATE - Tuesday, November 13th, 2:00PM PST
Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 10:00AM on November 13th to be considered.
Please call if you have any questions.
Thank you,
Maranda Maliska
Estimating
Office: 619-493-3064
Fax: 805-614-9906
E-mail: EstimatingSD@edwardscongroup.com
PDF ATTACHMENTS: