Trade Journal

Cen-Cal Construction

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Lead Compliance Plan, Develop Water Supply, Traffic Control, SWPPP, Relocate Water Tap, Remove Concrete, Remove Bollard, Clearing Grubbing, Roadway Excavation, Repair Landscape, Finish Roadway, Class II Base, Paving, Hot Mix Asphalt Type A, Concrete, Cold Plane Asphalt Concrete, Detectable Warning Surface, Fence, Gate, Parking Bumper, Relocate Mailbox, Block Wall, Survey Monument Encasement, Relocate Roadside Sign, Tubular Handrailing, Thermoplastic Pavement Marking, Paint Traffic Stripe, Remove Painted Traffic Stripe, Remove Thermoplastic Pavement Marking, Adjust Pull Box, Inductive Loop Detector, Mobilization


PROJECT NAME:

Pedestrian Path Improvements in Oildale Area

BID CONTRACT #:

25010

AWARDING AGENCY:

Kern County Public Works Department

PROJECT LOCATION:

Various Oildale Locations, Bakersfield, CA, 93308

BID DUE DATE:

11-06-2024 at 11:00 AM

OUTREACH COORDINATOR:

Jason Plank

TELEPHONE:

661-399-3759

FAX:

661-399-3812

ADDRESS:

34762 Lencioni Avenue , Bakersfield, CA, 93308

PROJECT DETAILS:

Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified DBE/SBE/WBE/MBE Contractors or Suppliers.  Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named: 

Pedestrian Path Improvements in Oildale Area

To be located in Kern County and funded in whole or part by federal funds.

Bid Date: November 6, 2024 @ 11:00 AM

Interested certified firms may contact Jason Plank @ (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on November 5, 2024.

** 11/5/2024- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid**

 

Bid documents and addendums can be obtained from:

https://kernpublicworks.com

 

*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *

 

We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DBE certified firms to contact Cen-Cal Construction to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.   Subcontractor and Supplier bids are required by 5:00 PM November 5, 2024.

 

Bids for the followings Items are being requested:

 


 

Item 1-Lead Compliance Plan

Item 2-Develop Water Supply                                                             

Item 3- Temporary Traffic Control                                                       

Item 4- Prepare WPCP     

Item 5- Relocate Garden Water Tap

Item 6- Remove Concrete                                             

Item 7- Remove Bollard

Item 8- Clearing & Grubbing                                                                  

Item 9- Roadway Excavation                                                                  

Item 10- Repair Existing Landscape                                             

Item 11- Finish Roadway 

Item 12- Class II Base

Item 13- HMA Type A

Item 14- Cold Plane Asphalt Concrete Pavement

Item 15- Detectable Warning Surface

Item 16-25 Misc. Minor Concrete

Item 26- Parking Bumper (Precast Concrete)                                                     

Item 27- Relocate Mailbox

Item 28- Reconstruct Wrought Iron Fence

Item 29- Reconstruct Wood Fence

Item 30- Reconstruct Chain Link Fence

Item 31- 35- Reconstruct Misc. Gates

Item 36- Reconstruct Block Wall

Item 37- Reset Chain Link Gate

Item 38- Reset Wrought Iron Gate (Rolling)

Item 39- Reset Wrought Iron Gate (Swinging)

Item 40- Survey Monument Encasement

Item 41- Relocate Roadside Signs

Item 42- Tubular Handrailing

Item 43- Reconstruct Bollard

Item 44- Thermoplastic Pavement Marking

Item 45- Paint Traffic Stripe

Item 46- Remove Painted Traffic Stripe

Item 47- Remove Thermoplastic Pavement marking

Item 48- Adjust Pull Box to Grade

Item 49- Inductive Loop Detector

Item 50- Mobilization 

 


 

     

** Also requesting Supplier Quotes**            ** All Items can be broken down by supplier and install**

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.