Hazard Construction Engr LLC

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, CHANNELIZERS, PREPARE SWPPP, FURNISH BMP MATERIALS, EROSION CONTROL, STREET SWEEPING, MANAGE SOLID WASTE, TREATED WOOD WASTE, CLEARING AND GRUBBING, DUST PALLIATIVE, ROADWAY EXCAVATION, DITCH EXCAVATION, IMPORT BORROW, ASPHALT SUPPLY, COLD PLANE AC PAVEMENT, READY-MIX CONCRETE SUPPLY, BAR REINFORCING STEEL, FURNISH RCP, WET UTILITIES, CONCRETE (CHANNEL LINING), CONCRETE (CONCRETE APRON), ROCK SLOPE PROTECTION, FURNISH RSP, MISCELLANEOUS IRON AND STEEL, STRIPING AND PAVEMENT MARKINGS, ROADSIDE SIGNS, FURNISH SIGN PANELS, TRUCKING, QUALITY CONTROL/TESTING, AGGREGATE SUPPLY


PROJECT NAME:

CT 11-056404 - RT 11Siempre Viva

BID CONTRACT #:

CT 11-056404

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

RT 11 at Siempre Viva Rd, San Diego, CA, 92154

BID DUE DATE:

11-14-2024 at 02:00 PM

OUTREACH COORDINATOR:

Amanda Redmond

TELEPHONE:

858-587-3600

FAX:

858-453-6034

ADDRESS:

10529 Vine Street, Lakeside, CA, 92040

PROJECT DETAILS:

Hazard Construction Engr LLC is seeking qualified and certified DBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below.

A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room.

*** THIS IS A PREVAILING WAGE PROJECT ***

IMPORTANT!  We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount.  Hazard will compensate for up to 3% for the required Bonds.

 

Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company’s Insurance Requirements for General Liability, Auto and Workers’ Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf

 

Please note that the requirements of SB 854 became effective on March 1, 2015.  From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIRNo Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor’s legal name or license number  https://efiling.dir.ca.gov/PWCR/Search.action

­­­

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.