is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE EL POTRERO PRE SCHOOL-MODERNIZATION â INCREMENT 2 Increment 2 of a Site Modernization at El Potrero Pre School in Moreno Valley. Increment 1 has been contracted and includes Interior and Site Demo, utility safe off, and erosion control. Scope of work in this phase of the project includes, but not limited to: All site work, finish site work, signage, paving, landscaping, concrete walkways, modernization to existing buildings to include removal & replacement of carpet, vinyl/LVL tile flooring, wall finishes, Tâ bar ceilings & acoustic panels, electrical, data, communication, lighting, doors, frames, door hardware, room or corridor extensions, exterior plaster and repair, roof repair, trenching & backfill for utilities.
El Potrero Elementary School Modernization - Increment 2
Not Available
Erickson-Hall Construction Co.
16820 Via Pamplona, Moreno Valley, CA, 92551
12-05-2024 at 02:00 PM
Summer Lumpkin
760-796-7700
Not Available
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
Job Walk: 11/12/2024 @ 9:00 AM (non-mandatory)
RFI Deadline: 11/19/2024 @ 2:00 PM
Prequalification Due: 11/21/2024
Bid Date: 12/5/2024 @ 2:00 PM
Lead Estimator: Chris Moore, cmoore@ericksonhall.com
Project Address: 16820 Via Pamplona, Moreno Valley, CA 92551
Bid Documents can be obtained by contacting planroom@ericksonhall.com
All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project requires Prevailing Wage, Skilled & Trained Workforce.
This project requires prequalification. Val Verde Unified School District requires all general contractors and all mechanical, electrical and plumbers (MEP) subcontractors utilizing any of the following licenses be prequalified with the District: General Contractors (A and B) and Subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46). Val Verde Unified School District uses PQBids (https://pqbids.com/valverde-usd) to manage prequalification.
If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security. Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees. We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html. SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5).