Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Portable Radar Speed Feedback Sign System, PCMS, Temporary Radar Speed Feedback Sign Systems, AFAD’s, Prepare SWPPP – Inspections & Reporting, Temporary Erosion Control – Check Dams & Fiber Rolls, Permanent Erosion Control – Dry Seed, Hydromulch & Compost, Tack Coat, Storm Drain Systems – 18” APC, 24” CSP, Removal, Concrete Backfill & Slurry Cement Backfill, Remove & Replace Monument, Relocate Mailbox, Remove Fence, Striping & Markers, Roadside Signs, Rumble Strip, Electrical – Maintain Existing TMS & Lighting System and Trucking


PROJECT NAME:

Construction on State Highway in San Joaquin County near Stockton from 0.2 Mile West of Walker Lane to 0.1 Mile East of Walker Lane

BID CONTRACT #:

Contract No. 10-1L2804

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Stockton, CA

BID DUE DATE:

12-03-2024 at 02:00 PM

OUTREACH COORDINATOR:

Erik Cushman

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance.  Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.

Social Media

Copyright © 2024 Compliance News All rights reserved.