is seeking certified and qualified DVBE subcontractors and/or suppliers to provide • Demolition, Concrete, Rebar, Cast-in-Place Concrete, Polished Concrete Finishing, Masonry, Structural Steel Framing, Steel Decking, Metal Fabrications, Pipe and Tube Railings, Decorative Formed Metal, Plastic Fabrications, Rough Carpentry, Cabinets, Plastic Paneling, Waterproofing, Insulation, Weather Barriers, Under-Slab Vapor Barrier, Metal Roof Panels, PVC Roofing, Sheet Metal Flashing and Trim, Roof Accessories, Joint Sealants, Hollow Metal Doors and Frames, Access Doors and Frames, Coiling Counter Doors, Aluminum Windows, Daylight Devices, Door Hardware, Fixed Louvers, Metal Framing, Gypsum Board, Ceramic Tile, Acoustical Ceilings, Resilient Base and Accessories, Flooring, Painting, Signage, Toilet and Bath Accessories and Compartments, Fire Extinguishers, Ground-Set Flagpoles, Miscellaneous Specialties, Food Service Equipment, Athletic Equipment, Metal Countertop and Metal Wall Shelves, Site Furnishings, Permanent Grandstands and Press Box, Portables Bleacher Seating, Plumbing, HVAC, Electrical, Communications, Voice/Data Infrastructure, Sound System, Intercom Clock System, Site Clearing, Earthmoving, Field and Track Subgrade Establishment, Dewatering, Excavation, Asphalt Paving, Track Asphalt Paving, Concrete Paving, Joint Sealants, Parking Bumpers, Pavement Markings, Tactile Warning Surfaces, Synthetic Turf, Rubberized Track, Field Imported Sants, Soil Preparation, Electric Gate Operations, Chain Link Fences and Gates, Concrete Retaining Walls, Wash water and Landscape Irrigation, Field Sod, Planting, Utilities, Subdrainage, Pond and Reservoir Liners.
Chula Vista High School Stadium Modernization
25-2933-AM
Sweetwater Union School District
820 4th Avenue, Chula Vista, CA, 91911
12-03-2024 at 12:00 PM
Bree
7605121188
NA
2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010
PROJECT DETAILS:
INVITATION TO BID
Sweetwater Union School District – Chula Vista High School Stadium Modernization
DEADLINE FOR BIDS: Tuesday, December 3, 2024, before 12:00 pm
Click HERE for Plans, Specs and Addendums
Kindly confirm your bid intention via email:
Project Details:
Encouraging DVBE, WBE, MBE, DBE, and SB Subcontractors & Suppliers to bid.
MANDATORY REQUIREMENTS:
Scenario | Required Documents |
Does Not Apply to Your Company | 1. Signed acknowledgment form. 2. Company letterhead confirming no diesel/off-road/rental or supplier use. |
Using Rental Company or Supplier | 1. Signed acknowledgment form. 2. Company letterhead confirming supplier use. 3. Supplier CARB certification. |
Directly Applies to Your Company | 1. Signed acknowledgment form. 2. Your company’s CARB certification. |
SUBCONTRACTOR PREQUALIFICATION:
PROJECT LABOR AGREEMENT:
PROJECT DESCRIPTION:
SUBMIT BIDS TO:
Email: Estimating@conanconstruction.com
Contact: Shannon Maurer - 760-707-2520
Thank you for your interest and participation in this project.
PDF ATTACHMENTS: