Hazard Construction Engr LLC

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN LEVEL 2 CRITICAL PATH METHOD SCHEDULE TIME-RELATED OVERHEAD (WDAY) DISPUTE RESOLUTION ADVISOR ON-SITE MEETING HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM STATIONARY IMPACT ATTENUATOR VEHICLE., TEMPORARY BARRIER SYSTEM PORTABLE CHANGEABLE MESSAGE SIGN (EA) TEMPORARY CRASH CUSHION TL-3 JOB SITE MANAGEMENT STORMWATER POLLUTION PREVENTION PLAN RAIN EVENT ACTION PLAN STORM WATER SAMPLING AND ANALYSIS DAY STORM WATER ANNUAL REPORT MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) TEMPORARY DRAINAGE INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE STREET SWEEPING TEMPORARY CONCRETE WASHOUT TEMPORARY WATER MANAGEMENT SYSTEM MANAGE SOLID WASTE GENERATED BY THE PUBLIC TREATED WOOD WASTE TEMPORARY ARROYO TOAD FENCE TEMPORARY HIGH-VISIBILITY FENCE TEMPORARY PROTECTION FENCE (ROPE) CLEARING AND GRUBBING (LS) ROADWAY EXCAVATION ROADSIDE CLEARING COMPOST SOCK HYDROSEED CLASS 2 AGGREGATE BASE (CY) ASPHALTIC EMULSION (FOG SEAL COAT) HOT MIX ASPHALT (TYPE A) SHOULDER RUMBLE STRIP (HMA,GROUND-IN INDENTATIONS) CENTERLINE RUMBLE STRIP (HMA GROUND-IN INDENTATION) PLACE HOT MIX ASPHALT DIKE (TYPE C) PLACE HOT MIX ASPHALT DIKE (TYPE E) PLACE HOT MIX ASPHALT DIKE (TYPE F) PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) TACK COAT REMOVE ASPHALT CONCRETE DIKE (F) - STRUCTURAL CONCRETE, HEADWALL STRESS REDUCING SLAB 24\" REINFORCED CONCRETE PIPE 36\" REINFORCED CONCRETE PIPE 24\" CONCRETE FLARED END SECTION REMOVE HEADWALL CLEANING, INSPECTING, AND PREPARING CULVERT (LF) CONCRETE INVERT PAVING 18\" CURED-IN-PLACE PIPELINER 24\" CURED-IN-PLACE PIPELINER 30\" CURED-IN-PLACE PIPELINER 42\" CURED-IN-PLACE PIPELINER STAIN GALVANIZED SURFACES (LF) RECONSTRUCT FENCE GUARD RAILING DELINEATOR PAVEMENT MARKER (RETROREFLECTIVE) MARKER (CULVERT) REMOVE ROADSIDE SIGN FURNISH LAMINATED PANEL SIGN (1\"-TYPE B) FURNISH SINGLE SHEET ALUMINUM SIGN (0.063\"-UNFRAMED) ROADSIDE SIGN - ONE POST ROADSIDE SIGN - TWO POST INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) MIDWEST GUARDRAIL SYSTEM (STEEL POST) VEGETATION CONTROL MAT (RUBBER OR FIBER) (F) - CABLE RAILING ALTERNATIVE IN-LINE TERMINAL TL-3 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) 6\" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) 8\" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) REMOVE THERMOPLASTIC PAVEMENT MARKING CONTRAST STRIPE PAINT (2-COAT) REMOVE TRAFFIC STRIPE FLASHING BEACON SYSTEM


PROJECT NAME:

Caltrans 11-430364 - Culvert repair, guardrail, flashing beacon and sign replacements

BID CONTRACT #:

11-430364

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Various Locations, San Diego, CA, 92065

BID DUE DATE:

12-04-2024 at 02:00 PM

OUTREACH COORDINATOR:

Amanda Redmond

TELEPHONE:

858-587-3600

FAX:

858-453-6034

ADDRESS:

10529 Vine Street, Lakeside, CA, 92040

PROJECT DETAILS:

Hazard Construction Engr LLC is seeking qualified and certified DVBE/SBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below.  A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room or download at the agency’s website: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php

*** THIS IS A PREVAILING WAGE PROJECT ***

IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount.  Hazard will compensate for up to 3% for the required Bonds. Please list your Bond Rate on your Proposal.

 

Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company’s Insurance Requirements for General Liability, Auto and Workers’ Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf

 

Please note that the requirements of SB 854 became effective on March 1, 2015.  From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIRNo Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor’s legal name or license number  https://efiling.dir.ca.gov/PWCR/Search.action

Social Media

Copyright © 2024 Compliance News All rights reserved.