Trade Journal

Kiewit Infrastructure West Co.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Kiewit Infrastructure West Co. requests sub bids and material quotes from subcontractors, suppliers, subconsultants, vendors, materials and/or equipment suppliers, truckers including qualified Disadvantaged Business Enterprises certified by the California Unified Certification Program (“CUCP”) as required by Title 49 CFR Part 26 in the following areas of work but not limited to those listed below: Clearing and Grubbing, Aggregates, Excavation and Embankment, Fencing, Shoring, Demolition, Cable Railing, Concrete, Structural Steel, Fueling and Lube Services, Gav. Electrical, Signaling, Directional Drilling, General construction site services, Geogrid, Geonet, Guard Rail, Drainage Pipe, Janitorial services, Landscaping, Hydroseeding, Quality Control, Auger Cast-in-Place Grouted Piling, Reinforcing Steel, Site Security services, Steel bearings, Street Sweeping, SWPPP, Track material supply, Traffic Control, Signage, Trucking, Water Truck.


PROJECT NAME:

San Onofre Double Track Phase 2

BID CONTRACT #:

Solicitation No. 4250093, CIP 1146600

AWARDING AGENCY:

San Diego Association of Governments (SANDAG)

PROJECT LOCATION:

MP 216.6 to MP 217.7 on a porton of the LOSSAN commuter rail corridor within Camp Pendleton in San Diego County, San Diego, CA

BID DUE DATE:

01-08-2025 at 10:00 AM

OUTREACH COORDINATOR:

socalestimating@kiewit.com

TELEPHONE:

562-946-1816

FAX:

See Building Connected

ADDRESS:

10704 Shoemaker Avenue, Santa Fe Springs, CA, 90670

PROJECT DETAILS:

Submit your interest to bid to socalestimating@kiewit.com for access to our Building Connected site. Building Connected includes plans, specifications, Community Benefits Agreement and CBA Letter of Assent, bid packages, bid forms, insurance and bonding requirements, Owner requirements including DBE, and KIWC standard subcontract and material contract templates. Plans and specifications may also be obtained from SANDAG through BidNetDirect or https://www.sandag.org.about/work-with-us/doing-business-with-SANDAG/current-contract-opportunitiesso. A valid California contractor license is required from subcontractors. Quotations must be valid for ninety (90) calendar days after the bid deadline as specified by the contract documents. Subcontractor's scope (including any conditions or exceptions) is required one week prior to bid deadline to allow proper evaluation. It is recommended that interested subcontractors and suppliers contact KIWC well ahead of the due date to discuss scope and quantities. Please contact the subject matter experts and they will provide you with assistance to clarify any questions regarding the scope of work or technical assistance. The subject matter experts will be listed on the scope of work documents as part of the Request for Proposal.  

Subcontractors are required to indicate all lower-tier DBE participants offered on their quotation. Subcontractor's scope must be based on the project reference documents provided on Building Connected. For this solicitation, SANDAG has established a DBE participation goal of 19.6%. KIWC makes its best attempt to provide subcontractors and suppliers with the most complete and accurate project information for bidding purposes. However, KIWC is not responsible for the accuracy of the drawings, specifications, addenda, and related bid documents. Subcontractors and suppliers are responsible for obtaining all the information necessary to provide a responsible and accurate quote. 

KIWC intends to seriously negotiate with qualified DBEs for project participation. To assist DBE subcontractors, KIWC will divide the work into economically feasible packages to ensure equitable and meaningful participation; referral assistance is available in obtaining bonds, lines of credit, insurance, equipment, supplies, materials or related assistance or services. 100% performance and payment bonds or material supply bonds are required. Subcontractors and suppliers may qualify for KIWC Subcontractor Default Insurance Program (SDI) by submitting with your bid, a letter frm a California licensed surety (on surety's letterhead) who is listed on the Federal Treasury Circular 570, signed by an authorized representative as evidenced by a current certified power-of-attorney, stating your aggregate and per project bonding capacity and the surety's approval to provide the performance and payment bonds or supplier bond as required for the Project. Your bid must include the cost of required minimum insurance: Commercial General Liability: $2,000,000 per occurrence/$2,000,000 aggregate; Auto Liability: $2,000,000 CSL; and Workers Comp/EL: $1,000,000. KIWC, SANDAG, CALTRANS, NCTD, U.S. Marine Corps Base Camp Pendleton, their directors, officers, agents, and employees shall be named as additional insured with a waiver of subrogation. Insurance companies must carry a minimum standard of AM Best rating of A-VII and be authorized to do business in California. This project is federally funded and with these funds comes an increased level of reporting and oversight as well as prevailing wage requirements per Department of Industrial Relations Labor Code 1720, Community Benefits Agreement (CBA), Federal Labor Provisions, Build America Buy America Act (BABA), etc. KIWC intends to conduct itself in Good Faith with DBE firms regarding participation on this project. We are an Equal Opportunity Employer. California Contractor license #433176.

Social Media

Copyright © 2024 Compliance News All rights reserved.