Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Stationary Impact Attenuator Vehicle, PCMS, K-Rail, Temporary Crash Cushion, Temporary Radar Speed Feedback Sign System, SWPPP, Storm Water Sampling & Report, Temporary Erosion Control, Street Sweeping, Temporary Fence, Clearing & Grubbing, Structure Backfill, Permanent Erosion Control, Hydroseed, AC Dike, Tack Coat, CIDH Concrete Pile, Minor Concrete, Furnish & Install Sign Structure, Reinforced Concrete Pipe, Adjust Utilities, Misc. Iron & Steel, Pavement & Object Marker, Roadside Signs, Midwest Guardrail System, Single Thrie Beam Barrier, Transition Railing, Alternative In-Line Terminal System, Crash Cushion, Concrete Barrier, Striping, Electrical and Trucking


PROJECT NAME:

US 101 - SR 85 Express Lanes (Phase 4)

BID CONTRACT #:

Contract C24123F

AWARDING AGENCY:

Santa Clara VTA

PROJECT LOCATION:

San Jose, CA

BID DUE DATE:

12-18-2024 at 02:00 PM

OUTREACH COORDINATOR:

Randy Bonino

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate DBE firms participation.

Social Media

Copyright © 2024 Compliance News All rights reserved.