Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide All bid items are available particularly these: Signs, Traffic Control Systems, Type III Barricade, Temporary Traffic Stripe, Traffic Drum, Portable Radar Sped Feedback Sign System, Temporary pavement Marker, Portable Changeable Message Signs (LS), Automated Flagger Assistance Device Day, Storm Water Pollution Prevention Plan, Storm Water Sampling and Analysis, Storm Water Annual Report, Temporary Erosion Control, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Treated Wood Waste, Noise Monitoring, Salvage Bench, Salvage Railroad Crossing Arms, Clearing and Grubbing, Soil Testing, Landscaping, Tree Protection, Plant Establishment Work, Wood Mulch, Root Barrier, Tree Grate, Pedestrian Grate, Bike Rack, Control and Neutral Conductors, ¾” Remote Control Valve, Solar Powered Bollard (Lighted), ¾” Backflow prevention Assembly, Tree Water Bags, Tree Well Sprinkler Assembly, Pop Up Sprinkler Assembly, PVC Pipe, Bench Type A, Benck Type B, Ball Valve, Pipe conduit (Sleeve), 8” Corrugated High Density Polyethylene Pip Conduit, Imported Soil Media, Hydroseed, Compost, Permanent Erosion Control Establishment Work, Tack Coat, Structural Concrete Retaining Wall, Steel Retaining Wall, Welded Wire Reinforcement 4”x4”, Pedestrian Barricade, Pedestrian Bulbout Railing, Public Safety Plan, Geocompost Drain, Minor Concrete, Detectable Warning Surface, Pre/Post Construction Surveys, Bus Stop Shelter (End Screen), Bus Stop Shelter Assembly, Misc. Iron and Steel, Water Service, Relocate Fire Hydrant, Decorative Column, Survey Monument, Adjust Utility Box and Cover to Grade, Paint Curb, Chain Link Fence, Pavement Marker Retroreflective, Aluminum Signs, Road Sign -One Post, Road Sign – Two Post, Install Sign (Strap and Saddle Method), Thermoplastic Traffic Stripe, Traffic Monitoring Station System, Modify Signal and Lighting Systems, and Trucking.


PROJECT NAME:

CONSTRUCTION ON STATE HIGHWAY IN MONTEREY COUNTY IN CASTROVILLE FROM 0.1 MILE SOUTH OF DEL MONTE AVENUE TO ROUTE 1/183 JUNCTION. Contract No. 05-1H6504

BID CONTRACT #:

Contract No. 05-1H6504

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Castroville, CA

BID DUE DATE:

12-18-2024 at 02:00 PM

OUTREACH COORDINATOR:

Randy Bonino

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company ‘Graniterock’ is signatory to Operating Engineers, Laborers, Teamsters, Carpenters, and Cement Masons unions. Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite 220, San Jose, or electronically at Caltrans Office Engineer website http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. 100% payment and 100% performance bonds in the amount of the subcontractor’s bid will be required from a qualified surety company. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work code(s) that apply to the scope of work they are quoting. Graniterock will break down items of work to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite Rock Company is an Equal Opportunity Employer. 

Social Media

Copyright © 2024 Compliance News All rights reserved.