Trade Journal

Nicholas Construction, Inc.

is seeking certified and qualified DBE, HUD Section 3, MBE, SBA 8(a), SBE, WBE, Small Business in a Rural Area (SBRA) and Labor Surplus Area Firm (LSAF) subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, AND BMPs, SCHEDULING, SURVEYING, CONSTRUCTION WATER, TEMPORARY FACILITIES, TRAFFIC CONTROL, SIGNAGE, TRUCKING, SWEEPING, CLEARING AND GRUBBING, DEMOLITION, POTHOLING, EARTHWORK, COMPACTION TESTING, GRADING, TRENCHING AND SHORING, PRECAST CONCRETE STRUCTURES, WELDING, REINFORCING STEEL, GENERAL CONCRETE AND FORMWORK, GROUTING, MISCELLANEOUS METALS, CHAIN LINK GATES AND FENCING, AGGREGATE MATERIALS, PAVING, CMU BUILDINGS, ROOFING, DOORS, WATERWORKS MATERIALS, FASTENERS, TURBINE PUMPS, SEWER HOLDING TANKS, PLUMBING, HVAC, PAINTING AND COATING, MATERIALS DISPOSAL, ELECTRICAL AND INSTRUMENTATION


PROJECT NAME:

MOJAVE RIVER PIPELINE TRAVELING SCREEN PROJECT

BID CONTRACT #:

Not Available

AWARDING AGENCY:

MOJAVE WATER AGENCY

PROJECT LOCATION:

8804 Duncan Rd, Victorville, CA, 92392

BID DUE DATE:

01-14-2025 at 02:00 PM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available by email request to alex@nicholasconstructioninc.com or available to view in our office upon request.

The majority of work consists, in general, of the installation of two traveling water screens and accessories at the California Aqueduct turnout, addition of a recharge pump station and building and associated electrical work, and addition of a groundwater recharge basin.

We will assist with Bonds, Lines of Credit, and Insurance, if needed. 

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (if required).

Social Media

Copyright © 2025 Compliance News All rights reserved.