is seeking certified and qualified DBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Channelizers, Portable Radar Speed Feedback Sign System / PCMS / Temporary Crash Cushion TL-3, Temporary Barrier System, SWPPP / Sampling & Analysis / Annual Report, Erosion Control – Temporary & Permanent, Creek Diversion / Dewatering, Treated Wood Waste, Invasive Species Control, Temporary High-Visibility Fence, Asphalt Dike & Shoulder Backing, Soil Decompaction, Roadside Clearing, Crack Treatment, Asphalt Rubber Binder, Seal Coat, Asphalt Milling / Micro-Milling, Diamond Grinding Asphalt & Bridge Deck Surfaces, Prime Coat / Tack Coat, Quality Control – Data Cores, Reinforcing Steel, Rapid Set Concrete / Remove Unsound Concrete, Prepare Bridge Deck Surface, Polyester Overlay, Bridge Removal, Bioretention, Storm Drain Underground, Minor Concrete, Striping & Markers, Concrete Barrier, California ST-75 Bridge Rail, Metal Beam Guardrailing / Alternative In-Line Crash Cushions, Vegetation Control, Tubular Railing, Roadside Signs and Rumble Strip
Construction on State Highway in Solano County near Suisun City from 0.2 Mile East of Lawler Ranch Parkway to 0.5 Mile East of Shiloh Road
Contract No. 04-2Q5504
Caltrans
Suisun City, CA
01-22-2025 at 02:00 PM
Erik Cushman
408-574-1400
408-365-9548
5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138
PROJECT DETAILS:
Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate DBE Firms participation.