is seeking certified and qualified Port of Long Beach SBE/ VSBE subcontractors and/or suppliers to provide Shimmick Construction Company, Inc. is a Prime Contractor requesting bids from SBE/ VSBE certified firms. Subcontractors/Professional Services/Suppliers for the following project: General work description: The Work required by this Contract includes, but is not limited to, the following: On an on-call basis, installation of Electric Vehicle (EV) and marine EV vessel charging infrastructure; temporary metering; replacement of electrical service infrastructure and equipment; repair and replacement of lighting, feeders, conductors, circuit breakers, and other electrical equipment; electrical testing; temporary power; earthwork; paving; grading; shoring; trenching; temporary fencing; soil and liquid waste disposal, and other similar work. Refer to Section 01 11 00, Summary of Work in the Technical Specifications. Scopes of work requested, but not limited to: Communication & Data, Precast Concrete, Selective Electrical Installation, Temporary Fencing, Bollards, Electrical Vehicle Charging Equipment, Electrical Vehicle Management System, Electrical Materials and Supplies, Selective Electrical Demo, Electrical System Identification, Electrical Power System Assessment, Lighting Fixtures and Poles, Excavation, Grading, Trenching, Trucking, Liquid and Hazardous Waste Removals, Soils Testing, Contaminated Soil Removals, Shoring and Bracing, Pavement Patching, Asphalt Paving, Concrete Paving, Concrete Flatwork, Curb & Gutter, Masonry, Aggregates Supply, Ready-Mix Concrete, Saw Cutting, Equipment Rental. Additional Scopes of Work may be found in the project documents.
On-Call Electrical Construction Port-Wide
HD-S3214
Port of Long Beach
725 Harbor Plaza, Long Beach, CA, 90802
02-04-2025 at 02:00 PM
Amy Roller
(949) 333-1500
(949) 333-1510
530 Technology Drive, Suite 300, Irvine, CA, 92618
PROJECT DETAILS:
Shimmick Construction will conduct itself in good faith with all firms participating in this project. Items of work may be broken down into economically feasible packages to encourage SBE/VSBE participation.
For additional project information or to discuss delivery schedules, obtaining bonding, lines of credit, insurance, technical assistance, necessary equipment, supplies, and/or materials please contact the lead estimator, Ty Keith @ Ty.Keith@shimmick.com or (714) 478-1934.
Shimmick Construction requests that Non-SBE/VSBE subcontractors provide lower-tier SBE/VSBE participation. Bidders are requested to indicate any lower-tier participation information so it can be evaluated as part of their quote.
Send all quotes and/or questions regarding to this project to email estimating.southwest@shimmick.com
Contract documents are available: * The contract documents, which include instructions to bidders, plans and specifications are available through our SmartBidNet Program: https://securecc.smartinsight.co/#/PublicBidProject/792399 .If you require assistance with access to plans/specs or contract documents, please contact Amy Roller at amy.roller@shimmick.com or (949) 704-2342.
CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
Bids submitted will confirm the acceptance of the terms and conditions of SCCI’s Standard Long Form Subcontract or Purchase Order, available upon request. A Subcontractor/Supplier providing a proposed bid/price will be viewed as accepting SCCI’s Standard Long Form Subcontract or Purchase Order-100% Performance and Payment bonds are required for subcontractors; material bonds are required from all suppliers. Shimmick Construction will pay bond premium up to 2%. Subcontractors/Suppliers will be required to abide by terms and conditions of the AGC Master Labor Agreements. All proposers are bound by the prime contract terms and conditions, including payment provisions. Insurance coverage is required as set by the prime contract and/or Shimmick Construction – whichever is greatest. Minimum insurance requirements: General Liability $1M-Per Occurrence/$2M-Agg/$2M-Completed Operations; Excess Liability $5M; Auto Liability $1M; Workers Comp & Employer Liability $1M. Project specific insurance requirements are provided in detail the Special Conditions. The listing of a Subcontractor/Supplier is not to be construed as an acceptance of all the conditions or exceptions included with the price quote. Shimmick requires that Subcontractor & Supplier price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Shimmick Construction Company, Inc. is An Equal Opportunity Employer