is seeking certified and qualified DBE subcontractors and/or suppliers to provide The project shall include rehabilitating AC pavement; modifying/reconstructing curb ramps; adjusting valve boxes and manholes to finished grade; installing storm drain pipe, inlet and manhole; modifying traffic signals, replacing loop detectors, and restriping.
Barstow Avenue Rehabilitation
PROJECT NO. CIP 21-17 STBG 5208 (191)
CITY OF CLOVIS
BARSTOW AVENUE CLOVIS CA, Clovis, CA, 93611
01-28-2025 at 02:00 PM
Garrett Brown
6614964265
Not Available
P.O. Box 71377, Bakersfield, CA, 93387
PROJECT DETAILS:
The project shall include rehabilitating AC pavement; modifying/reconstructing curb ramps; adjusting valve boxes and manholes to finished grade; installing storm drain pipe, inlet and manhole; modifying traffic signals, replacing loop detectors, and restriping.