is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Gyp Board, Acoustical Tile Ceilings and Walls, Flooring, Cleaning of Vinyl Wall Covering, Painting, Fiberglass Reinforced Laminate,


PROJECT NAME:

Florin High School Phase 1 Classroom Upgrades

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Elk Grove Unified School District

PROJECT LOCATION:

7956 Cottonwood Lane, Sacramento, CA, 95828

BID DUE DATE:

02-18-2025 at 02:00 PM

OUTREACH COORDINATOR:

Pam Galbreath

TELEPHONE:

209-838-7388

FAX:

209-838-3960

ADDRESS:

1804 Jackson Ave, Escalon, CA, 95320

PROJECT DETAILS:

Lease Leaseback Project. Seeking Sub Bids Only.

Phase 1: Summer 2025, Scope - Interior upgrades to select spaces throughout the campus, including:

  • Carpet/base replacement
  • Resilient flooring/base replacement
  • Wall damage and vinyl wall covering repair
  • Wall, door, frame and ceiling painting
  • Select ceiling tile replacement
  • Minor casework repairs and tune-up
  • Room identification signage

*Scope does not include any exterior work or lighting upgrades.

Engineers Estimate:     $1.75 M 

Pre-bid Job walk: Wednesday, February 5, 2025 at 2:00 PM

Location: Florin High School 7956 Cottonwood Lane, Sacramento, CA 95828

Warranty Period: This project has a 2-year warranty period.

Bid Proposal Submission: Bid Proposals are to be emailed to estimator@ctbrayton.com or faxed to (209) 838-3960. Bid Proposals emailed elsewhere may not be received in time for submission.

MEP Prequalification in compliance with Public Contract Code section 20111.6 is required for this Project. Therefore, mechanical, electrical, and plumbing (“MEP”) subcontractors (as defined by Public Contract Code section 20111.6(k)) must be prequalified by the District prior to the LLB Entity submitting its Proposal. MEP subcontractors subject to these requirements are those with any of the following license classifications: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46. MEP Subcontractors are encouraged to complete the prequalification process as soon as possible to expedite evaluation. The prequalification information is located on the Elk Grove Unified School Districts website.  http://www.egusd.net/about/divisions-departments/business-services-and-facilities/facilities-and-planning/

Plans and Specs can be reviewed on our Website at www.ctbrayton.com under “Bidding”.

All Bidders must review insurance requirements and include any additional costs in their cost proposals.

PLEASE INCLUDE YOUR DIR REGISTRATION NUMBER AND CONFIRM YOU CAN MEET AB-566 / SB-693 SKILLED AND TRAINED WORKFORCE REQUIREMENTS WHEN SUBMITTING BID.

DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.

a.         All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and

b.         Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.

 AB-566 / SB-693 Skilled and Trained Workforce Requirements:

All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project. 

 Subcontracts will awarded by the “Best Value Subcontractor Selection” process.  

All responsive bidders will be scored according to the following format.

  Best Value Subcontractor Selection:  The following items will be graded on a point basis as indicated. Higher scores indicate a higher level of compliance in the opinion of the scorer. One scorer will be chosen to represent the Owner, Architect, and C.T. Brayton & Sons, Inc. The Subcontractor with the highest score will be considered the ‘Best Value’ and awarded a Subcontract accordingly.

  • 15 Points          Price
  • 10 Points          Similar Projects (Includes experience with Architect, Owner, GC)
  • 8 Points            Demonstrated ability to meet the Insurance Requirement (COI) and Safety
  • 7 Points            Bonding Capacity
  • 5 Points            Local Business Participation
  • 5 Points            Manpower / Capacity to perform / “Skilled and Trained” workforce compliance

                                    50 Points Maximum Possible Score per Scorer. 

All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.

This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.

All subcontractors must be bondable.

Premiums will be paid by C.T. Brayton & Sons, Inc.