is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Concrete, masonry, Structural Steel, studs and joints, metal fabrication, pipe and tube railings, rough carpentry, glue laminated beams, architectural wood casework, plastic paneling, thermal insulation, weather barriers, vapor retarders, concrete roof tiles, PVC Roofing, flashing and sheet metal, roof accessories, joint sealants, hollow metal doors and frames, aluminum storefronts, windows, door hardware, glass glazing, plastering, gypsum board, tiling, acoustical panel ceilings, resilient flooring and base, resinous flooring, wall coverings, acoustic insulation, painting, signage, toilet accessories, fire protection, metal canopies, countertops, sprinkler systems, plumbing, natural gas piping, electrical water heaters, plumbing fixtures, HVAC, voice communication and structured cabling, alarm system.
East Bakersfield High School Modernization Phase 1: Student Store and Shade Structure Installation
Bid No. 6400
Kern High School District
2200 Quincy Street, Bakersfield, CA, 93306
01-29-2025 at 02:00 PM
Ken Smith
661-393-0708
702-974-1774
10721 Rio Mesa Dr., Bakersfield, CA, 93308
PROJECT DETAILS:
Ken W. Smith Construction, Inc is an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.
Plans and specs available at: https://vendors.planetbids.com/portal/14319/portal-home
Hard copies: Blueprint Service Company, 1100 18th Street, Bakersfield, CA 9331 661-327-2501