Trade Journal

Youda Builders Inc

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide CARPENTRY, ELECTRICAL, LOW VOLTAGE, HAZMAT ABATEMENT


PROJECT NAME:

Abraham Lincoln High School Generator and Electrical IT Upgrade REBID

BID CONTRACT #:

SFUSD PROJECT NO: 12384

AWARDING AGENCY:

San Francisco Unified School District

PROJECT LOCATION:

2162 24th Ave, San Francisco, CA, 94116

BID DUE DATE:

02-11-2025 at 02:00 PM

OUTREACH COORDINATOR:

Tze Tsang

TELEPHONE:

4154898378

FAX:

Not Available

ADDRESS:

1500 18th Ave, San Francisco, CA, 94122

PROJECT DETAILS:

Youda Builders Inc, An Equal Opportunity Employer is requesting quotations from all qualified DVBE sub-contractors and/or material suppliers for the following project:

Abraham Lincoln High School Generator 

and Electrical IT Upgrade REBID  SFUSD PROJECT NO: 12384

 San Francisco, CA

Owner: San Francisco Unified School District

Bid Date: 2/11/2025 at 2:00pm

Proposal due by 2/11/2025 at 11:00am


YOUDA BUILDERS INC. is requesting quotes from all qualified subcontractors and suppliers but not limited to:
CARPENTRY, ELECTRICAL, LOW VOLTAGE, HAZMAT ABATEMENT

 

The Project is generally described as including but not limited to: expanding the existing MDF into the adjacent room; upgrading HVAC system; new network racks and ladder system; grounding busbar system for new and existing equipment; electrical outlets; a reinforced concrete pad to support a generator system; a new natural gas generator, generator controller, and

generator enclosure; network equipment for the generator; a transfer switch and generator associated electrical panel; new outlets connected to the generator electrical panel per the design plans; fiber optic cables from MDF to a location inside the new generator enclosure; and electrical connections to new and existing electrical panels. The new system will meet all District Design Standards and Guidelines and Department of Technology Standards. All construction shall occur after school hours and on weekends. No system outage shall occur during school hours. A dual system will function until the cutover to the new system is completed.  The estimated construction cost is $840,000.00.

 

Subcontractors shall provide performance and payment bond if required.

Contact ttyoudabuilders@gmail.com for BID DOCUMENTS info and BID SUBMISSION.

Social Media

Copyright © 2025 Compliance News All rights reserved.