is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide Adjust Pullbox To Grade, Cold Plane Asphalt Concrete Pavement, Construction area signs, Furnish Single Sheet Aluminum Sign, Guard Railing Delineator, Install Roadside Sign Panel on Existing Post, Install Sign (Strip and Saddle Bracket Method), Lead compliance plan, Pavement Marker (Retroreflective), Portable changeable message sign (EA), Remove Pavement Marker, Roadside Sign – One Post, Shoulder Backing, Temporary pavement marking (paint) Temporary traffic stripe (paint), Thermoplastic pavement marking (enhanced wet night visibility), 12" thermoplastic traffic stripe (enhanced wet night visibility), Remove thermoplastic traffic stripe, Remove thermoplastic pavement marking, 12" rumble strip (asphalt concrete pavement), 6" traffic stripe tape (warranty) (broken 17-7), 6" traffic stripe tape (warranty) (broken 36-12), 6" traffic stripe tape with contrast (warranty), 6" traffic stripe tape with contrast (warranty) (broken 17-7), 6" traffic stripe tape with contrast (warranty) (broken 36-12), 8" traffic stripe tape with contrast (warranty), Modifying traffic monitoring stations, Traffic control system, Water Pollution Control Program.
CALTRANS 12-0V0004 RTE. 261
12-0V0004
CALTRANS
FROM 0.6 MILE NORTH OF PORTOLA PARKWAY OVERCROSSING TO JUNCTION ROUTE 241, IRVINE, CA, 92602-92679
02-19-2025 at 02:00 PM
Monica Baldacci
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website: www.sully-millerplans.com, or the CALTRANS website at www.dot.ca.gov/hq/esc/oe/weekly_ads/adv_priorweek.
Sully-Miller is willing to set aside any portion of work, no matter how small to encourage
(DVBE PARTICIPATION -3% SBE PARTICIPATION -5% participation. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related services, please call our office.
100% Payment and Performance Bonds May Be Required
PDF ATTACHMENTS: