Bugler Construction, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide POSITIVE LOCATION OF EXISTING UNDERGROUND INFRASTRUCTURE, LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION ADVISOR ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY CRASH CUSHION TL-3, AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY LARGE SEDIMENT BARRIER, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, CONTRACTOR SUPPLIED ARBORIST, TEMPORARY WILDLIFE EXCLUSION FENCE, TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY BOUNDARY SIGN (ON POST), CLEARING AND GRUBBING, ROADWAY EXCAVATION, STRUCTURE EXCAVATION (SOLDIER PILE WALL), STRUCTURE BACKFILL (SOLDIER PILE WALL), CONCRETE BACKFILL (SOLDIER PILE WALL), CONCRETE BACKFILL, LEAN CONCRETE BACKFILL, IMPORTED BORROW, ROADSIDE CLEARING, SOIL AMENDMENT, PLANT TUBE, PLANT (GROUP H), PLANT (GROUP A), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, TEMPORARY IRRIGATION SYSTEM, MOVE-IN/MOVE-OUT (EROSION CONTROL), DUFF (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), REMOVE ASPHALT CONCRETE PAVEMENT (SQFT), REMOVE ASPHALT CONCRETE DIKE, TEMPORARY SHORING, STEEL SOLDIER PILE (W 14 X 120), 30" DRILLED HOLE, STRUCTURAL CONCRETE, BARRIER SLAB, STRUCTURAL CONCRETE, BOX CULVERT, STRUCTURAL CONCRETE, HEADWALL, STRUCTURAL CONCRETE, DRAINAGE INLET, PRECAST CONCRETE LAGGING, BAR REINFORCING STEEL (BOX CULVERT), CLEAN AND PAINT STEEL SOLDIER PILING, REMOVE RETAINING WALL (PORTION), GALVANIC ANODES, 24" ALTERNATIVE PIPE CULVERT, 30" ALTERNATIVE PIPE CULVERT, 36" ALTERNATIVE PIPE CULVERT, STRESS REDUCING SLAB, 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE, 36" REINFORCED CONCRETE PIPE, 24" ENTRANCE TAPER, CABLE ANCHORAGE SYSTEM (MOD), 24" ANCHOR ASSEMBLY, CABLE ANCHORAGE SYSTEM, DRAINAGE INLET MARKER, 18" CONCRETE FLARED END SECTION, 24" CONCRETE FLARED END SECTION, 30" CONCRETE FLARED END SECTION, 36" CONCRETE FLARED END SECTION, 24" ALTERNATIVE FLARED END SECTION, 30" ALTERNATIVE FLARED END SECTION, 36" ALTERNATIVE FLARED END SECTION, 36" PRECAST CONCRETE PIPE INLET, ABANDON CULVERT, REMOVE CULVERT, REMOVE DEBRIS RACK, REMOVE INLET, REMOVE HEADWALL, REMOVE JUNCTION BOX, REMOVE ASPHALT CONCRETE OVERSIDE DRAIN, REMOVE FLARED END SECTION, CLEANING, INSPECTING, AND PREPARING CULVERT, ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (CURB, GUTTER, SIDEWALK AND DRIVEWAY), REMOVE CURB, MISCELLANEOUS IRON AND STEEL, ADJUST UTILITY COVER TO GRADE, PREPARE AND STAIN CONCRETE, STAIN GALVANIZED SURFACES, RELOCATE MAILBOX, JACKED 30" REINFORCED CONCRETE, JACKED 36" REINFORCED CONCRETE, JACKED 120" REINFORCED CONCRETE, REMOVE FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), OBJECT MARKER (TYPE P), MIDWEST GUARDRAIL SYSTEM (STEEL POST), REMOVE BURIED POST END ANCHOR, STRENGTHENED MIDWEST GUARDRAIL SYSTEM (STEEL POST), MIDWEST GUARDRAIL SYSTEM (8' STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), CONTROLLED LOW STRENGTH MATERIAL, TUBULAR BICYCLE RAILING, TRANSITION RAILING (TYPE AGT), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL TL-3, BURIED POST END ANCHOR, CALIFORNIA ST-76 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, REMOVE CRASH CUSHION, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TEMPORARY SIGNAL SYSTEMS


PROJECT NAME:

Drainage system upgrades and slope stabilization at inlets & outlets

BID CONTRACT #:

05-1G9504

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

05-SCr-9-9.0/25.5, Ben Lomond, CA, 95005

BID DUE DATE:

02-13-2025 at 02:00 PM

OUTREACH COORDINATOR:

Glenn Bugler

TELEPHONE:

5105798711

FAX:

9254167746

ADDRESS:

4847 Hopyard Road Suite-4-395, Pleasanton, CA, 94588

PROJECT DETAILS:

Bugler Construction, Inc. is actively seeking subcontractors and suppliers on this project.  Subcontractors must possess a valid California Contractors License and have current registration with the California Department of Industrial  Relations.  Subcontractors must be able to provide current general liability insurance,  workers compensation insurance and be prepared to provide payment and performance bonds.  Bugler will pay cost of bonds up to 2.0% of full subcontract amount of this project.  Bugler will assist in obtaining insurance, bonds, lines of credit, supplies, materials and equipment.  Plans and Specifications can be viewed by appointment at our Pleasanton Office or sent electronically upon request.  Bugler is signatory to the operators, laborers, cement mason and carpenters unions.  Subcontractors will need to be signatory or sign a project labor agreement with approate union. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.