is seeking certified and qualified DVBE subcontractors and/or suppliers to provide metal fabrications, firestopping, joint sealant, acoustic tile ceiling, paint, electrical, PA clock system, abatement, wood casework, door hardware, window hardware, toilet accessories, evacuation chairs, elevators, plumbing, drinking faucets, sinks, toilets, toilet accessories, mechanical, automation, fire alarm, communication system
Aptos, Bessie Carmichael, Everett, Francisco, Presidio, Rooftop Mayeda, and Roosevelt Middle Schools PA System Upgrades Package 4
12382
San Francisco Unified School District
105 Aptos Ave, San Francisco, CA, 94127
03-04-2025 at 02:00 PM
Kennedy Chan
(650) 557-1238
(650) 557-1239
1009 Terra Nova Blvd., Pacifica, CA, 94044
PROJECT DETAILS:
The Project is generally described as including, but not limited to: Public Address System Upgrades including associated cabling, integrated clock-bell devices, wall speakers, exterior speakers and head-end equipment at the following campuses:
· Aptos Middle School - 105 Aptos Ave, San Francisco, CA 94127
· Bessie Carmichael Middle School - 824 Harrison St, San Francisco, CA 94107
· Everett Middle School - 450 Church St, San Francisco, CA 94114
· Francisco Middle School - 2190 Powell St, San Francisco, CA 94133
· Presidio Middle School - 450 30th Ave, San Francisco, CA 94121
· Rooftop Mayeda Middle School - 500 Corbett Ave, San Francisco, CA 94114
· Roosevelt Middle School - 460 Arguello Blvd, San Francisco, CA 94118
CONTRACTOR'S LICENSE REQUIRED FOR THE WORK: Class B, General Contractor with Asbestos and Lead Certification or Sub-Contractor with Asbestos and Lead Certification performing the work. Data cabling, fiber, and low-voltage system work must be performed by C-7 licensed contractor. Conduit and electrical work to be performed by C-10 licensed contractor. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law.
PROJECT LABOR AGREEMENT: All Bidders are hereby notified that the District has a Project Labor Agreement (PLA) in effect on the Project and all contractors and subcontractors bidding this project will be required to comply with the PLA.
All questions about the meaning or intent of the Contract Documents are to be directed in writing to Anatasha Craigie at: craigiea@sfusd.edu. Questions received less than seven (7) days prior to the date for opening Bids may not be answered.