is seeking certified and qualified DBE, MBE and WBE subcontractors and/or suppliers to provide Mobilization/Demobilization, Traffic Control, Construction Job Site Management, Develop Water Supply, Contractor Supplied Biologist, Clearing and Grubbing, Storm Water Pollution Prevention Plan (SWPPP), Rain Event Action Plan (REAP), Storm Water Annual Report, Storm Water Sampling and Analysis, Full Depth Reclamation with 4% Cement (FDR-C), Supplemental Aggregate Base (Shoulder Backing), Prime Coat/Tack Coat, Hot Mix Asphalt (HMA), 0.25' - 2 lifts of 0.125' (Type A, 1/2" PG 64-10), Hot Mix Asphalt - AC Dike. (Type A, 1/2" PG 64-10), Place HMA – AC Dike (Type A), Place HMA – AC Dike (Type E), Hot Mix Asphalt - Misc. (Type A, 1/2" PG 64-10), Place HMA - Misc (Type A, 1/2" PG 64-10), Adjust Metal Beam Guardrail, 12" Dia CMP Culvert Replacement, 24in Dia CMP Culvert Replacement, 24in Dia CMP Flared End Section, Driveway Preparation, Thermo Plastic Striping, Thermo Plastic Pavement Markings, Pavement Markers (Retroreflective) - Type D, Vehicle Detector Loops, Fiber Rolls, Temporary Check Dam, Survey Monument Wells, Street Sweeping, Final Erosion Control, Finish Roadway
Ophir Rd Rehabilitation
533-2023-17
County of Butte
Ophir Rd, Oroville, CA, 95965
03-18-2025 at 02:00 PM
Levi Hubbard
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.
Assistance is available to DBE’s, MBE's, and WBE's for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.