Trade Journal

Steelhead Constructors JV

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Furnish Field Office, Construction Funding Sogn, Federal Trainee, Traffic Control System, Temporary Traffic Stripe (Paint), Temporary Railing (Type K), Temporary rash Cushion Module, Job Site Management, Prepare and Implement Storm Water Pollution Prevention Plan, Stormwater Sampling and Analysis Day, Storm Water Annual Report, Permeant Erosion Control Establishment Inspection, Permanent Erosion Control Establishment Work, State Water Resources Control Board N.O.I. Fee, Bird Exclusion Plan, Install and Maintain Bird Exclusion Devices, Payment Adjustments for Price Index Fluctuation of Paving Asphalt, Temporary Creek Diversion Systems, Temporary High-Visibility Fence, Clearing and Grubbing (LS), Roadway Excavation – Final Pay Item, Structure Excavation (Type D) Final Pay Item, Structure Backfill (Bridge -Final Pay Item, Hydromulch, Fiber Rolls, Hydroseed, Finishing roadway, Class 2 Aggregate Base (CY) – Final Pay Item, Hot Mix Asphalts (Type A), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Cold Plane Asphalt Concrete Pavement, 30” Cast-In-Driled-Hole Concrete Piling, 36” Cast-In-Drilled-Hole Concrete Piling, Prestressing Cast-In-Place Concrete, Structural Concrete, Bridge Footing -Final Pay Item, Structural Concrete Bridge – Final Pay Item, Structural Concrete Bridge (Polymer Fiber) – Final Pay Item, Joint Seal (MR 2”), Bar Reinforcing Steel (Bridge) - Final Pay Item, Bridge Removal, 18” Corrugated Steel Pipe (.064” thick), Rock Slope Protection (150 LB Class III Method B) (CY), Rock Slope Protection Fabric (Class 8), Minor Concrete (Gutter)(LF), Miscellaneous Metal (Bridge) – Final Pay Item, Fence (Type BW, Metal Post), Remove Fence, Reconstruct Fence (Type P), Pavement Marker (Retroreflective), Object Marker (Type P), Remove Marker, Remove Roadside Sign, Remove Metal Post, Roadside Sign – One Post, Short Radius Guardrail System, Vegetation Control (Minor Concrete), Tubular Bicycle Railing – Final Pay Item, Transition Railing (Type AGT), Alternative In-Line Terminal System, Concrete Barrier (Type 85), Remove Wood Guardrail -Final pay Item, 6” Thermoplastic Traffic Stripe, Thermoplastic Traffic Stripe (Broken 12-3), Remove Painted Traffic Stripe, Mobilization.


PROJECT NAME:

Jacalitos Creek Bridge Replacement On Lost Hills Road

BID CONTRACT #:

24-28-C

AWARDING AGENCY:

County of Fresno

PROJECT LOCATION:

CA

BID DUE DATE:

03-27-2025 at 03:00 PM

OUTREACH COORDINATOR:

Kelly Knight

TELEPHONE:

5302266400

FAX:

Not Available

ADDRESS:

2940 Innsbruck Drive, Redding, CA, 96003

PROJECT DETAILS:

Jacalitos Creek Bridge Replacement on Lost Hills Road 24-08-C, 

Federal Project No. BRLO-5942(234). BID DATE: Marich 27, 2025, at 2:00 P.M.

 Engineer’s Estimate: $7.2-8M, DBE Goal: 17% Working Days: 150

Steelhead Constructors JV (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed at your local builder’s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with an email prior to the bid date describing the scope of your work. Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units. 

Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters, and Cement Masons Unions. All subcontractors must possess a current contractor’s license, insurance, and workers’ compensation coverage meeting Steelhead’s requirements and will be required to sign Steelhead’s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html Sincerely, STEELHEAD CONSTRUCTORS JV Estimating Department 530-226-6400. Please email quotes to estimating@steelheadconstructors.com