is seeking certified and qualified DVBE subcontractors and/or suppliers to provide metal fabrications, firestopping, joint sealant, acoustic tile ceiling, paint, electrical, PA clock system, abatement, wood casework, door hardware, window hardware, toilet accessories, evacuation chairs, elevators, plumbing, drinking faucets, sinks, toilets, toilet accessories, mechanical, automation, fire alarm, communication system
Bryant Elementary School Technology Upgrade & PA System Upgrades (REBID)
12418 & 12424
SAN FRANCISCO UNIFIED SCHOOL DISTRICT
2641 25th Street, San Francisco, CA, 94110
03-20-2025 at 02:00 PM
Kennedy Chan
(650) 557-1238
(650) 557-1239
1009 Terra Nova Blvd., Pacifica, CA, 94044
PROJECT DETAILS:
THE TECHNOLOGY UPGRADE is generally described as: Technology and data upgrades that include, but are not limited to, the demolition of the existing MDF in room 03A and the existing IDF-LIB located in the Bungalows. A new MDF build-out in storage room 22A and a new outdoor exterior IDF build-out near the Bungalows, with additional electrical work to accommodate expansion; new data drops, network equipment and connections to accommodate expanded technology requirements affecting the main building, classrooms, administrative offices, corridors, other service areas; installation of data and phone network equipment and systems; network racks and equipment with associated conduit, cabling, fiber, electrical wiring, and panels; and, demolition and removal of abandoned equipment and materials, hazardous materials removal.
The Estimated construction value of the Technology Upgrade work is $510,890.00
THE PA SYSTEM UPGRADE is generally described as: Public Address System Upgrades including associated cabling, integrated clock-bell devices, wall speakers, exterior speakers and head-end equipment, to upgrade and expand the existing Public Address system coverage and installation of a remote door device, new central exchange unit and client station at Byrant Elementary School.
The Estimated construction value of the PA System Upgrade work is $657,792.00
PROJECT LABOR AGREEMENT: All Bidders are hereby notified that the District has a Project Labor Agreement (PLA) in effect on the Project and all contractors and subcontractors bidding this project will be required to comply with the PLA.
All questions about the meaning or intent of the Contract Documents are to be directed in writing to the District to Qendrese Alalusi at: alalusiq@sfusd.edu AND Summer Naranjo at: naranjos@sfusd.edu. Questions received less than seven (7) days prior to the date for opening Bids may not be answered.
(This Project is a REBID. Previously scheduled bid date was 12/12/24.)