Colas Construction USA Inc

is seeking certified and qualified DBE, HUD Section 3, SBA 8(a), SDVOSB, VOSB, WOSB, Small Businesses (SBs)Small Disadvantaged Businesses (SDBs), HUBZone Small Businesses (HUB) and HBCU/MI's subcontractors and/or suppliers to provide EROSION CONTROL ELECTRICAL CONCRETE FLATWORK ASPHALT AND CONCRETE PAVEMENT DEMOLITION MILITARY FENCING TEMPORARY TRAFFIC SIGNAGE EARTHWORK (GRADING) CONTAMINATED HAULING & DISPOSAL CONCRETE COMPRESSION SEALS STORM DRAINAGE DRILLED CAISSONS (6.5FT DIA) FIBER OPTIC COMMUNICATION UTILITY CONSTRUCTION WATER UTILITY CONSTRUCTION PAVEMENT MARKING EQUIPMENT RENTALS SEWEER UTILITY CONSTUCTION SURVEY CONSTRUCTION/MOBIL TRAILERS PORTABLE TOILETS JANITORIAL SERVICES TEMPORARY POWER SERVICES ASPHALT PAVING REMOVE/ABANDON UTILITIES QUALITY CONTROL & MATERIAL TESTING CONCRETE PAVING WATER TRUCKS SWEEPING LANDSCAPING (SEEDING) IAS AC 478 BUILDING ERECTOR


PROJECT NAME:

Ellsworth AFB B21-East Apron Environmental Protection Shelters

BID CONTRACT #:

W9128F25R0005

AWARDING AGENCY:

U.S. ARMY CORPS OF ENGINEERS

PROJECT LOCATION:

Ellsworth Air Force Base, Rapid City, SD, 57706

BID DUE DATE:

03-25-2025 at 08:00 AM

OUTREACH COORDINATOR:

Nina Allington

TELEPHONE:

7149843636

FAX:

Not Available

ADDRESS:

135 S. State College Blvd. Suite 400, Brea, CA, 92821

PROJECT DETAILS:

 

Colas SWCP Simon JV

Hello ,

We are inviting your Company to bid on:  Ellsworth AFB B21-East Apron for the following codes: 

 See Attached "Invitation To Bid"

Your proposals are due no later than March 19, 2025 12:00 PM PST.

Here is some of the project information. It includes, but is not limited to:

Ellsworth Airforce Base will be the home to new squadron of B21 Bombers. During operations, these bombers are placed in a readiness position where they await deployment. While in this readiness position, the Airforce needs to protect their bombers from precipitation & UV rays. Ellsworth command selected EPS shelters as the technical solution. As shown in the title sheet, 4 Ea. shelters will be delivered under this contract while the adjacent 7 Ea. shelters will be awarded separately under one or more future contracts. The project also requires the construction of PCC aircraft taxiway pavement and both asphalt & concrete pavement. 

 If you have any questions regarding this project, please contact me.

Thank you,
Rowan Durr
(714) 578-9600
estimating@colasinc.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.