is seeking certified and qualified DVBE subcontractors and/or suppliers to provide STRUCTURE DEMOLITION, SELECTIVE DEMOLITION, CONCRETE FORMING AND ACCESSORIES, CONCRETE REINFORCING, CAST-IN-PLACE CONCRETE, POLISHED CONCRETE FINISHING, METAL FABRICATIONS, ROUGH CARPENTRY, SHEATHING, GLUE-LAMINATED CONSTRUCTION, PLASTIC PANELING, THERMAL INSULATION, WEATHER BARRIERS, UNDER-SLAB VAPOR BARRIER, STEEL SIDING, POLYVINYL-CHLORIDE (PVC) ROOFING, SHEET METAL FLASHING AND TRIM, JOINT SEALANTS, EXPANSION JOINT COVER ASSEMBLIES, HOLLOW METAL DOORS AND FRAMES, ACCESS DOORS AND FRAMES, SECTIONAL DOORS, TRAFFIC DOORS, ALUMINUM WINDOWS, TUBULAR SKYLIGHTS, DOOR HARDWARE, PORTLAND CEMENT, PLASTERING, GYPSUM BOARD, ACOUSTICAL PANEL CEILINGS, RESINOUS FLOORING, EXTERIOR PAINTING, INTERIOR PAINTING, PANEL SIGNAGE, FIRE EXTINGUISHERS, LOADING DOCK BUMPERS, STATIONARY LOADING DOCK EQUIPMENT, FOODSERVICE EQUIPMENT, PLUMBING GENERAL PROVISIONS, PLUMBING INSULATION, FACILITY WATER DISTRIBUTION PIPING, FACILITY SANITARY SEWERS, SANITARY WASTE PIPING SPECIALTIES, STORM DRAINAGE PIPING, STORM DRAINAGE PIPIING SPECIALTIES, PLUMBING SYSTEMS, HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS, TESTING, ADJUSTING, AND BALANCING, ELECTRICAL, COMMUNICATIONS, VOICE / DATA / IP INFRASTRUCTURE, TELEPHONE / INTERCOM / CLOCK SYSTEM, ELECTRONIC SAFETY AND SECURITY, SECURITY SYSTEM, FIRE ALARM SYSTEM, SITE CLEARING, EARTH MOVING, TERMITE CONTROL, EXCAVATION SUPPORT AND PROTECTION, ASPHALT PAVING, CONCRETE PAVING JOINT SEALANTS, CONCRETE PAVING, PAVEMENT MARKINGS, TACTILE WARNING SURFACING, DECORATIVE METAL FENCES AND GATES, UTILITIES, STORMWATER CONVEYANCE, SUBDRAINAGE
Escondido High School Kitchen Project
2024-25-3
Escondido Union High School District
1535 N Broadway, Escondido, CA, 92026
03-26-2025 at 02:00 PM
Maranda Maliska
6197842704
805-614-9909
4350 Executive Dr, Suite 205, San Diego, CA, 92121
PROJECT DETAILS:
Edwards Construction Group is currently pursuing the Escondido HS Kitchen Project for Escondido Union High School District
SCOPE OF WORK
This project will consist of the demolition of the existing Kitchen, Serving lines, rear delivery stairs, and dock area. It includes the installation of a new Storage Facility, Kitchen, and an indoor Speed Line to distribute food to the students. The Storage addition is to contain walk-in Freezer and Cooler units along with all the equipment required to support their operation. This includes floor sinks, power, lighting, data, and fire alarm. New HVAC systems and fire sprinklers will be required for the entire building. Path of Travel requirements and restroom upgrades are part of the renovation work. In addition, a new entrance gate is required for the main parking lot. All landscaping revisions and re-routing of irrigation will be completed by the District.
Please let us know if you are interested in sending us your bid for this project, and we will invite you to our bid planroom.
Est Construction Budget: $6,000,000 to $7,000,000
This is a PREVAILING WAGE project.
There is a DVBE Participation requirement of 3%
BID DATE - Wednesday, March 26, 2025, 2:00PM PST
Please note that the listed due date and time is the time that all completed paperwork is due. We request that all bids be sent to us no later than 10AM, March 26th to be considered.
Please call if you have any questions.
Thank you,
Maranda Maliska
Estimating
Office: 619-784-2704
Cell: 661-972-0503
E-mail: estimatingsd@weareedwards.com & maranda@weareedwards.com
Our emails have changed! Please update our contact information
PDF ATTACHMENTS: