Trade Journal

Granite Rock Company

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Survey / Staking, Roadside Signs / Barricades / Construction Area Signs, Traffic Control, Striping – Temporary & Permanent, SWPPP Preparation / Inspection / Reporting, Tree Removal, Tack Oil / Asphaltic Emulsion, Minor Concrete – Curb / Gutter / Sidewalk / Ramps, Utility Adjustments, Erosion Control – Temporary & Permanent, Underground – Storm Drain / Water / Sewer, Electrical – Street Lighting and Trucking


PROJECT NAME:

Green Island Road Reconstruction and Widening Project

BID CONTRACT #:

Project Number TR16-0700

AWARDING AGENCY:

City of American Canyon

PROJECT LOCATION:

American Canyon, CA

BID DUE DATE:

04-08-2025 at 02:00 PM

OUTREACH COORDINATOR:

Erik Cushman

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate SBE, MBE, WBE & DBE firms participation.

Social Media

Copyright © 2025 Compliance News All rights reserved.