Trade Journal

Sausal Corporation

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Division 02 Existing Conditions 02 41 00 Demolition Division 12 Furnishings 12 93 00 Site Furnishings and Accessories Division 26 Electrical 26 05 00 Basic Electrical Requirements 26 08 00 Testing 26 24 00 Distribution System 26 27 00 Basic Materials and Methods 26 56 01 Site Lighting Division 27 Communications 27 00 00 Telecommunications 27 51 03 Assisted Listening System Division 28 Electronic Safety and Security 28 31 01 Fire Alarm System Division 31 Earthwork 31 00 00 Earthwork and Grading 31 10 00 Site Clearing 31 23 33 Trenching and Backfilling Division 32 Exterior Improvements 32 12 33 Paving and Surfacing 32 18 13 Synthetic Turf 32 18 14 Synthetic Turf Base 32 31 19 Decorative Metal Fence 32 84 00 Irrigation System 32 90 00 Standard Planting Division 33 Utilities 33 05 13 Utility Grade Adjustment33 10 00 - Water System 33 30 00 Sanitary Sewer System 33 40 00 Storm Drainage 33 46 00 Subdrainage


PROJECT NAME:

VALLEY VIEW ELEMENTARY SCHOOL TK BUILDING INCREMENT 1

BID CONTRACT #:

Project No. 2023-PU003-002

AWARDING AGENCY:

Pleasanton Unified School District

PROJECT LOCATION:

480 Adams Way, Pleasanton, CA, 94566

BID DUE DATE:

04-03-2025 at 01:30 PM

OUTREACH COORDINATOR:

Teena Singley

TELEPHONE:

9255682200

FAX:

Not Available

ADDRESS:

3550 Willow Pass Road, Concord, CA, 94519

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through link https://www.sausalplans.net#files/share/B275A577E3

‘We will assist with Bonds, Lines of Credit and Insurance if needed. Plans & specs available to view in our office.”

“Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans available from owner or are available for review at our office in prior to bid day.”

“Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).”

Social Media

Copyright © 2025 Compliance News All rights reserved.