is seeking certified and qualified DBE subcontractors and/or suppliers to provide MOBILIZATION, LEAD COMPLIANCE PLAN, BASELINE SCHEDULE (CRITICAL PATH METHOD), ADVANCED NOTIFICATION, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE AND IMPLEMENT STORM WATER POLLUTION PREVENTION PLAN, STREET SWEEPING, CLEARING AND GRUBBING, CONSTRUCTION SURVEYS, REMOVE STREET LIGHT AND PULL BOX, REMOVE IRRIGATION, POTHOLE (HIGH PRIORITY UTILITIES), ROADWAY EXCAVATION, ROADWAY EXCAVATION (PULVERIZED MATERIAL) (F), SHOULDER BACKING, CLASS 2 AGGREGATE BASE, PULVERIZED ROADBED, ASPHALTIC EMULSION (PULVERIZED ROADBED), FULL-DEPTH RECLAMATION-CEMENT, CEMENT (FULL-DEPTH RECLAMATION-CEMENT), ASPHALTIC EMULSION (FULL-DEPTH RECLAMATION-CEMENT), MIX DESIGN (FULL-DEPTH RECLAMATION-CEMENT), HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT (MISC AREA), COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, MINOR CONCRETE (CURB TYPE A1-6), MINOR CONCRETE (CURB AND GUTTER A2-6), MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB RAMP), CONTINOUSILY REINFORCED CONCRETE PAVEMENT, REMOVE CONCRETE, REMOVE RAISED MEDIAN, DETECTABLE WARNING SURFACE, ADJUST MONUMENT COVER TO GRADE, ADJUST ACCESS BOX FRAME AND COVER (TOWN TS), ADJUST ACCESS BOX FRAME AND COVER (UTILITY), ADJUST MANHOLE FRAME AND COVER (UTILITY), ADJUST MANHOLE FRAME AND COVER (STORM DRAIN), REMOVE AND REPLACE SURVEY POINT, REMOVE AND REPLACE STREET MONUMENT, LOWER AND RAISE FRAME AND COVER (UTILITY), LOWER AND RAISE FRAME AND COVER (HYDRANT), REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, ROADSIDE SIGN - ONE POST, THERMOPLASTIC PAVEMENT MARKING, 6" TERMOPLASTIC TRAFFIC STRIPE, 8" TERMOPLASTIC TRAFFIC STRIPE, PAVEMENT MARKERS (RETROREFLECTIVE-RECESSED), PAVEMENT MARKERS (BLUE RETROREFLECTIVE-RECESSED), TEMPORARY SIGNAL DETECTION, MODIFY SIGNAL AND LIGHTING @ PEARSON/BLACK OLIVE, MODIFY SIGNAL AND LIGHTING @ PEARSON/SKYWAY, MODIFY SIGNAL AND LIGHTING @ PEARSON/RECREATION DRIVE, MODIFY SIGNAL AND LIGHTING @SKYWAY/ELLIOTT, MODIFY SIGNAL AND LIGHTING @SKYWAY/MAXWELL, RECTANGULAR RAPID FLASHING BEACON
On-System Roadway Rehabilitation - Misc 2025
7303.5 CON
Town of Paradise
Multiple Streets in the Town of Paradise, Paradise, CA, 95969
04-24-2025 at 02:00 PM
Levi Hubbard
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.
Assistance is available to DBE’s for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.