is seeking certified and qualified DBE, MBE, SBE, WBE and Build America Buy America (BABA) subcontractors and/or suppliers to provide proposals for the Phase 2B Waterline Replacement (Patricia Lane) located in South Lake Tahoe, El Dorado County, CA as shown on the plans. The proposed project includes the installation of approximately 1,470 LF new 6-inch waterline and, water services, meter boxes, various connections to existing (including shut-down & draining procedures), and fire hydrant assemblies. Surface improvements include trenching and patch work over the proposed waterline improvements after installation is complete, Tahoe Regional Planning Agency (TRPA) BMPs during construction, and restoration to existing. SECTION 01 33 00 – SHOP DRAWINGS & SUBMITTAL PROCEDURES SECTION 01 43 00 – QUALITY ASSURANCE / QUALITY CONTROL SECTION 01 50 05 – MOBILIZATION AND DEMOBILIZATION SECTION 01 55 26 – CONSTRUCTION TRAFFIC CONTROL SECTION 01 57 19 – CODES, PERMITS, AND PREVENTION OF ENVIRONMENTAL POLLUTION SECTION 01 66 00 – DELIVERY, STORAGE, AND HANDLING SECTION 01 74 00 – PRESERVATION, RESTORATION AND CLEANUP SECTION 02 41 00 – SALVAGE AND DEMOLITION SECTION 03 30 00 – CONCRETE SECTION 31 05 00 – EARTHWORK SECTION 31 23 16 – TRENCH EXCAVATION, BACKFILLING AND COMPACTION SECTION 32 11 23 – AGGREGATE BASE COURSE SECTION 32 12 16 – ASPHALT CONCRETE PAVING SECTION 33 01 10 – PRESSURE PIPE TESTING AND DISINFECTION SECTION 33 05 13 – UTILITY GRADE ADJUSTMENTS SECTION 33 14 13 – WATER DISTRIBUTION
Phase 2B Patricia Waterline Replacement Project
9593.006
Lukins Brothers Water Company
Patricia Lane (Between 10th & 12th Street), South Lake Tahoe, CA, 96150
04-30-2025 at 01:00 PM
Angela Rocconi
5305414700
Not Available
1012 Industrial Ave Suite 2, South Lake Tahoe, CA, 96150
PROJECT DETAILS:
Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available by contacting our estimating department
Full conformance with the project plans and specifications is required