is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIM design, electric vehicle chargers, water vapor emission control system, commissioning, SWPPP, final clean, surveying, demolition, reinforcing steel, cast-in-place concrete, sealed concrete, masonry, structural steel, metal deck, handrails and railings, rough carpentry, finish carpentry, cabinets and millwork, FRP, waterproofing, insulation, roofing, thermoplastic membrane roofing, sheet metal flashing and trim, metal siding and composite wall cladding, doors, overhead doors, glass, storefronts, curtain walls, glazing films, louvers, drywall, lath and plaster, ceramic tile, acoustical ceilings, carpet, resilient flooring, wood flooring, resinous and epoxy flooring, acoustical treatment, painting, visual display boards, whiteboards, signage, toilet partitions, operable partitions, wall and corner guards, fire extinguishers and cabinets, lockers, exterior sun control devices, food service equipment, projection screens, window coverings, site furnishings, fabric structures, elevators, fire sprinklers, plumbing, HVAC, electrical, communications, intercom systems, audio visual, fire alarm system, intrusion detection, earthwork, ac paving, site concrete, unit pavers, fences, athletic track, landscaping, site utilities
Long Beach City College - Building E College Center
25-004
Long Beach Community College District
4901 E Carson St., Long Beach, CA, 90808
04-18-2025 at 02:00 PM
Alicia Daniel
9516781038
9516781083
22710 Palomar Street, Wildomar, CA, 92595
PROJECT DETAILS:
PROJECT DESCRIPTION:
The complete demolition of the existing Building āEā. In its entirety, including all slab on grade, foundations, basements, pits, wet/dry utilities beneath the boundary of the Project. Cut/Cap, label and provide utility boxes outside of the work boundary.
The new three-story student center will be constructed in its place. The main programmatic function of the building is dedicated to Group A-2 assembly dining and associated Commercial Kitchen, Group A-3 assembly lecture halls and Group B Business Higher Education spaces including offices, computer labs and support spaces.
Estimated Cost: $61,000,000
Project Duration: 23 Months to Substantial Completion
Prevailing Wage Project
Hold Bids for 90 days
Community and Student Workforce Project Agreement in place