is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ADJUST UTILITIES, CMU-RETAINING WALL, COLD MILLING, CONSTRUCTION STAKING, ELECTRICAL/STREET LIGHTING, FENCING, LANDSCAPE & IRRIGATION, SHORING (RETAINING WALL CONSTRUCTION), SIGING & STRIPING, MATERIALS, RENTAL EQUIPMENT, TRUCKING.
UNIVERSITY DRIVE PAVEMENT REHABILITATION AND TRANSIT IMPROVEMENTS
BID NO. CPP-PW21007
CALIFORNIA STATE POLYTECHNIC UNIVERSITY-POMONA
UNIVERSITY DRIVE, POMONA, CA, 91768
04-26-2022 at 03:00 PM
Jessica Daniels
Not Available
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website: www.sully-millerplans.com, or can be obtained electronically after the required NON-REFUNDABLE deposit of $50.00 per set has been made, by requesting them from Hector Muniz, hmuniz@cpp.edu.
Sully-Miller is willing to set aside any portion of work, no matter how small to encourage (DVBE PARTICIPATION-3%) participation. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related services, please call our office.
100% Payment and Performance Bonds May Be Required