is seeking certified and qualified DBE subcontractors and/or suppliers to provide This is a project for the City of Palo Alto involving a bridge replacement in Palo Alto (Santa Clara County), California. Engineer’s Estimate: $12,000,000 Contract Time: 1.5 years (work within the creek is limited to June 15th through October 15th) Granite Construction Company (Granite) is requesting quotes on this project from all qualified subcontractors and suppliers including certified DBE firms for any portion of the work, but specifically the following suggested items: Environmental plans and compliance measures; Quality Control/Testing; Construction Area Signs; Traffic Control; Clearing & Grubbing; Tree Removal; Bridge Removal (Demo); Concrete removals; Sawcutting; Grind & Groove Bridge Deck; AC Grinding; Dewatering; Water Control; Stream Diversion; Survey; Video; Noise and Vibration Monitoring; Structural Concrete; CIDH Piling; Rebar; Concrete pumping; Block Wall (precast retaining walls); Graffiti Coating (Painting); Landscaping; Irrigation; Water line relocation; 10” PVC Water Line (City of Palo Alto); Utility adjustments; Relocate Gas Line & Valve; Hauling of construction materials and Hauling of export from the site. Please contact our office if there are additional items, or portions of items, your firm is interested in bidding. Granite Construction will break down items of work to facilitate DBE participation on this project. All non-DBE subcontractors are also encouraged to utilize DBE suppliers for their work, where possible. If you have any project scope questions, please contact Granite's ESTIMATOR: Fred Ackerman - (408) 327-7053 – fred.ackerman@gcinc.com SEND QUOTES to: coastal.estimating@gcinc.com by or before 12:00 pm on bid day.
Newell Road Bridge Replacement, Palo Alto (Santa Clara County)
PE-12011/IFB194068
City of Palo Alto
Newell Road at Woodland Avenue, Palo Alto, CA, 94303
05-13-2025 at 03:00 PM
Patricia Arnett
831-763-6100
831-761-1042
580 West Beach Street, Watsonville, CA, 95077
PROJECT DETAILS:
Project plans are covered by a Confidentiality Agreement and must be obtained directly from the City of Palo Alto. Please download the “Utility Map Request Form” from the planroom link below, complete and submit completed form as soon as possible to: UtilityMapRequest@paloalto.gov in order to access plans for this project. Request may take a day or more, so it is essential to request these are early as possible.
Project Specifications can be downloaded from our Pipeline Suite planroom linked below:
https://projects.pipelinesuite.com/ehPipelineSubs/dspOpenProject/projectID/324520
Granite intends to work cooperatively with all qualified DBE firms seeking work on this project.
Granite is an equal opportunity employer.
Granite Construction Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions.
100% performance and payment bonds may be required for the full amount of subcontract price. Granite Construction will assist with bonding costs for subcontractors. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors#
Subcontractors must possess a current contractor’s license and current DIR number. All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/quote-solicitation