Trade Journal

Zovich & Sons Inc

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Rebar, Shotcrete, Structural Steel, Steel decking, Carpentry, Casework, FRP, Composite Metal Panels, Sheet Metal, Firestopping, Joint Sealants, D/F/H, Coiling Doors, Smoke Curtains, Aluminum Windows Glazing, Gyp Board, Tile, Acoustical Paneling, Flooring, Paint, Signage, Lockers, Fire Protection Specialties, Window Shades, Elevators, Fire Sprinklers, HVAC, Electrical, Plumbing, Paving, Utilities, Dewatering, Trenching


PROJECT NAME:

LANEY COLLEGE THEATER MODERNIZATION

BID CONTRACT #:

Bid No. 24-25/05

AWARDING AGENCY:

Peralta Community College District

PROJECT LOCATION:

900 Fallon St, Oakland, CA, 94607

BID DUE DATE:

05-23-2025 at 12:00 PM

OUTREACH COORDINATOR:

Jovan Torres

TELEPHONE:

(925) 775-4227

FAX:

(925) 238-0428

ADDRESS:

103 Technology Court, Suite A, Brentwood, CA, 94513

PROJECT DETAILS:

We are accepting proposals from all trades/suppliers for work associated with Divisions 03 thru 33. Project consists of: Demolition and construction necessary for the modernization of the existing Laney Theater Building inclusive of the following: extensive modifications for accessibility; a glass curtain wall; lobby extension with new elevator; expanded restrooms/amenities; a new north lobby and entry; upgrades to the 300-seat auditorium, technical theater, and AV systems; upgrades to existing classrooms, visual and sound labs; fire alarm modifications; roof replacement; and replacement of the existing mechanical systems.

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available:

  1. Local Builders Exchanges
  2. Requesting link from admin@zovichconstruction.com

 Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company.

We are accepting sub/supplier pricing from all divisions 2 thru 33 listed in the contract specifications.  

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.