is seeking certified and qualified MBE, SBA 8(a), SBE, WBE and Labor Surplus Area subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, SCHEDULING, SURVEY, TRUCKING, TEMPORARY FACILITIES, TRAFFIC CONTROL, DEMOLITION, POTHOLING, CLEARING AND GRUBBING, TRENCHING, SHORING, EARTHWORK, GRADING, WATERWORKS MATERIALS, READYMIX CONCRETE, PRECAST CONCRETE STRUCTURES, AGGREGATE MATERIALS, MISCELLANEOUS METALS, REINFORCING STEEL, WELDING, STEEL CASING, STEEL PIPING, HYDROSTATIC TESTING, PATCHING AND PAVING, STRIPING, PAINTING AND COATING, CATHODIC PROTECTION


PROJECT NAME:

THE DELTA PIPELINE IMPROVEMENTS PROJECT

BID CONTRACT #:

PP-505

AWARDING AGENCY:

Semitropic Water Storage District

PROJECT LOCATION:

Varies, Schuster Rd from Wildwood Ave to Palm Avenue, Wasco, CA, 93280

BID DUE DATE:

05-30-2025 at 02:00 PM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available by email request to alex@nicholasconstructioninc.com or available to view in our office upon request.

The majority of work consists, in general, of: the replacement of existing 24-, 27-, and 36-inch steel pipelines with parallel 42-inch steel and 24-, 30-, and 36-inch PVC pipelines; the removal and disposal of interfering sections of existing pipelines; connections to existing laterals, turnouts, and pump station; buried valve assemblies; 58-inch steel casing pipe crossing; cathodic protection.

We will assist with Bonds, Lines of Credit, and Insurance, if needed. 

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (if required).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.