is seeking certified and qualified DBE subcontractors and/or suppliers to provide Line No. Item Code Description Qty Units 10 406-D001 Fine Milling of Bituminous Pavement, All Depths 6,667 SQYD 20 407-A001 Asphalt for Tack Coat 667 Gallon 30 619-A1002 Temporary Traffic Stripe, Continuous White 2,980 LF 40 612-A2002 Temporary Traffic Stripe, Continuous Yellow 2,980 LF 50 619-A3002 Temporary Traffic Stripe, Skip White 5,960 LF 60 619-D1001 Standard Roadside Construction Signs, Less than 10 Square Feet 32 SQFT 70 619-D2001 Standard Roadside Construction Signs, 10 Square Feet or More 40 SQFT 80 619-G4005 Barricades, Type III, Single Faced 48 LF 110 907-405-A001 Stone Matrix Asphalt, 9.5 mm Mixture 375 Ton 120 907-413-E001 Sawing and Sealing Transverse Joints in Asphalt Pavement 80 LF 150 907-618-A001 Maintenance of Traffic 1 Lump Sum 160 907-618-M2001 Work Zone Law Enforcement ($60.00) 160 Hours 170 907-626-A008 6" Thermoplastic Double Drop Traffic Stripe, Skip White 5,960 LF 180 907-626-C011 6" Thermoplastic Double Drop Edge Stripe, Continuous White 2,980 LF 190 907-626-F004 6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow 2,980 LF 200 907-627-K001 Red-Clear Reflective High Performance Raised Markers 100 EA
Remove & Replace High Friction Surface Treatment (Bridge Nos. 96.3A & 96.3B) on I-55 north of the Fortification Street Exit
HSIP-0055-02(284) / 10986730
MDOT
MS, 39212
05-27-2025 at 05:00 PM
Patrick Lambson
6024371711
6024371821
1310 W. 23rd Street, TEMPE, AZ, 85282
PROJECT DETAILS:
The Truesdell Corporation is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. The Truesdell Corporation is not a union signatory contractor. Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies. Please contact us should you need assistance in obtaining the plans, specifications and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation’s Standard Subcontract Agreement.
PDF ATTACHMENTS: