Trade Journal

Reyes Construction Inc

is seeking certified and qualified DBE subcontractors and/or suppliers to provide (Subcontractors): Electrical (Street Lighting), Street Sweeping, Clear & Grub, Minor Concrete, Minor Concrete Structures, Striping & Signage, Asphalt Paving, Landscape (Hydromulch and Hydroseeding), Fencing & Railing, Trucking, Surveying, Reinforcing Steel, CIDH Pile, Post Tensioning, CMU Block Wall & Stone Veneer, Concrete Barrier, Metal Beam Guard Rail, Traffic Control(Construction Area Sign, Joint Seal Assembly, Import Soil, Gamma-Gamma Test, Groove & Grind Concrete Pavement, Profilograph, Driven Pile, Bridge Removal, AC Grinding & Pulverizing and Quality Control (Suppliers): Aggregates, Misc. Metals, Ready Mix Concrete, BMP Materials, Lumber, RCP Pipe, Traffic Control Signage, Bearing Pads, Misc. Concrete Supplies and Rip Rap


PROJECT NAME:

Rock Springs Road Bridge Over the Mojave River

BID CONTRACT #:

H15087

AWARDING AGENCY:

SANDAG

PROJECT LOCATION:

San Bernardino, CA

BID DUE DATE:

06-12-2025 at 10:00 AM

OUTREACH COORDINATOR:

Christina Ramos

TELEPHONE:

909-622-2259

FAX:

Not Available

ADDRESS:

1383 South Signal Dr., Pomona, CA, 91766

PROJECT DETAILS:

DBE Goal: 18%

Project Scope: 
The work consists of constructing a new bridge, demolishing an existing bridge, grading the channel, installing rock- slope protection, asphalt paving, installing MGS guardrails, signage and striping , and other bridge appurtenant work. The purpose of this project is to alleviate the flood dangers to motorists by replacing the existing two-lane low water crossing with a bridge over the Mojave River. 

Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, 
materials or related technical assistance. 

For information on the availability of scope of work, plans and specifications, and requirements of the contract please contact our office. Plans, Specifications, and Contract requirements can be viewed online at no cost here: 

1)    Via iSqFt -please send an email request to estimating@reyesconstruction.com
2)    San Bernardino County -San Bernardino County -/bso/seller/bidAck.sdo (status=Open)
3)    Via Sharefile -please send an email request to estimating@reyesconstruction.com

 

By submitting a proposal, Respondent/Bidder acknowledges that they have performed a thorough review of the terms and conditions contained in our standard subcontract/purchase order (Contract). Respondenf/Bidder quotes, including terms and conditions contained therein, will not be included in subcontracts/purchase orders issued for the project. Respondenf/Bidder shall submit, in writing with their proposal/quote, any exceptions to the RGI Contract terms and conditions. 
 

Note: RCI may disqualify and reject the respondent's proposal/bid based on the exceptions submitted. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.