is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ABATEMENT, DEMOLITION, CONCRETE, POLISHED CONCRETE FINISHING, REBAR, MASONRY, STRUCTURAL STEEL, METAL FABRICATIONS, STEEL DECKING, FENCING, DECORATIVE FORMED METAL, PLASTIC FABRICATIONS, ROUGH CARPENTRY, FRP, CABINETRY (CASEWORK & COUNTERTOPS), WATERPROOFING, THERMAL INSULATION, WEATHER BARRIERS, METAL AND PVC ROOFING, SHEET METAL FLASHING AND TRIM, ROOF ACCESSORIES, DOORS, FRAMES, AND HARDWARE, ACCESS DOORS AND FRAMES, OVERHEAD DOORS, WINDOWS, STOREFRONTS AND GLAZING, TUBULAR DAYLIGHTING DEVICES, FIXED MULLION LOUVER, METAL FRAMING, GYPSUM BOARD, CERAMIC TILING, ACOUSTICAL CEILINGS, RESILIENT BASE, RESINOUS FLOORING, PAINTING AND COATINGS, SIGNAGE AND PLAQUES, TOILET, BATH, LAUNDRY ACCESSORIES, FLAGPOLES, FIRE PROTECTION SPECIALTIES, FOODSERVICE EQUIPMENT, ATHLETIC EQUIPMENT, METAL COUNTERTOP AND METAL SHELVES, GRANDSTAND BLEACHERS AND PRESS BOX, PORTABLE BLEACHERS, PLUMBING, HVAC, ELECTRICAL, ELECTRONIC SAFETY & SECURITY, COMMUNICATIONS, FIRE ALARM, EARTHWORK AND GRADING, ASPHALT PAVING, SPECIAL TRACK AND FIELD WORK, SYNTHETIC TURF SURFACING, RUBBERIZED TRACK SURFACING, FIELD IMPORTED SANDS, LANDSCAPING AND IRRIGATION, UTILITIES, SCOREBOARD, FINAL CLEANING, DDC CONTROLS, TESTING, ADJUSTING, AND BALANCING, EQUIPMENT MOVING, TREE LACING, TRIMMING AND REMOVAL, SWPPP, TRAFFIC CONTROL, SURVEYING, UTILITY LOCATING
Southwest High School Stadium Modernization
BID 24-2899-AM
Sweetwater Union High School District
1685 Hollister St, San Diego, CA, 92154
06-10-2025 at 02:00 PM
Maranda Maliska
619-784-2704
805-614-9909
4350 Executive Drive, Suite 205 , SAN DIEGO, CA, 92121
PROJECT DETAILS:
Edwards Construction Group is currently pursuing the Southwest High School Stadium Modernization project for Sweetwater Union High School District.
SCOPE OF WORK
New High School Stadium project including Home and Visitor Bleachers, Press Box, ticket booth, artificial turf sports field, 9 lane rubber surface track, Home and Visitor Concessions Buildings, Field House Storage conversion, Musco light poles, American with Disabilities Act (ADA) improvements, retaining walls, concrete paving, utilities, sitework, and landscaping.
Est Construction Budget: $31,800,000
Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project.
This is a PREVAILING WAGE project.
There is a PROJECT LABOR AGREEMENT.
https://facilities.sweetwaterschools.org/pla/
There is a 3% DVBE Participation requirement.
There is a MEP Subcontractor Prequalification requirement.
"Any bid listing subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered,” ANY listed subcontractor holding one of those licenses stated in Public Contract Code section 20111.6(k) must be prequalified for this project regardless of the scope of work assigned to that subcontractor.
The Prequalification application is available at the SUHSD Purchasing Website, under the Contractor Prequalification tab. Contractor Pre-Qualification are due to Purchasing: May 27, 2025 by 2:00 p.m. See the link below:
https://purchasing.sweetwaterschools.org/contractor-pre-qualification/
BID DATE - Tuesday, June 10, 2025, 2:00PDT
Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 10AM, June 10 to be considered
Please call if you have any questions.
Thank you,
Maranda Maliska
Estimating
Office: 619-784-2704
Cell: 661-972-0503
E-mail: estimatingsd@weareedwards.com & maranda@weareedwards.com & jack@weareedwards.com
Our emails have changed! Please update our contact information