is seeking certified and qualified DBE subcontractors and/or suppliers to provide Water Pollution Control, Erosion Control, SWPPP, Traffic Control, Construction Area Signs, Flagging, Sweeping, Cold Plane Pavement, Storm Drain, Sewer Laterals, AC Paving, Tack Coat, Adjust Castings, Concrete Removal, Curb & Gutter, Sidewalks, Hot Mix Asphalt, Aggregate Base, Oil, Concrete, RCP, Striping, Construction Survey, Traffic Signal Loop Installation, Trucking
Benjamin Holt Drive Pavement Rehabilitation
Federal Aid Project No. STPL-5929(313)
San Joaquin County Department of Public Works
Benjamin Holt Drive, Stockton, CA, 95219
06-05-2025 at 01:30 PM
Ashley Cruz
209-932-2100
209-948-6652
655 W. Clay Street, Stockton, CA, 95206
PROJECT DETAILS:
Contact Knife River Construction for assistance in obtaining bonds, insurance, lines of credit, equipment, supplies, materials or project plans and specifications.
Knife River Construction is willing to break out any portion of work to encourage DBE participation.
The DBE Contract goal is 21 percent for this project.
We are an Equal Opportunity Employer.
Please contact Knife River Construction by 6/4/2025 with quotes.