is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide Polished Concrete, Masonry, Roofing/Waterproofing, Flashing/Sheet Metal, Doors/Frames/Hardware, Overhead Doors, Tile, Acoustical Ceilings, Flooring, Painting, Window Treatments, Landscaping
California Governor's Office of Emergency Services Southern Regional Emergency Operations Center
Not Available
Department of General Services
2301 South Shelley Circle, Costa Mesa, CA, 92626
08-05-2025 at 12:00 PM
Christina Alvarado
9492541131
Not Available
1900 S. State College Blvd., Suite 150, Anaheim, CA, 92806
PROJECT DETAILS:
Design Build State of the California Governor’s Office of Emergency Services Southern Regional Emergency Operations Center. The project will include an Office Building (approximately 39,000 gsf), a warehouse (approximately 21,000 gsf), a 120-foot-tall communication tower, a guard shack, trash enclosure, diesel generators, water storage tanks, and a sanitary sewer tank.
Demolition will be completed in August 2025. Project is scheduled to be complete 2nd quarter of 2027.
Prequalification:
All Subcontractors must be prequalified and approved in Turner’s Prequalification System to submit a proposal. To prequalify for this project, Subcontractor must:
Please direct prequalification questions to: socalpurchasing@tcco.com
Questions during bidding:
Direct all questions during bidding to Turner Construction via email to Ann Hoang at ahoang@tcco.com. Deadline to submit RFI’s is 7/23/25, at 12:00 pm. Each trade will also have an assigned project engineer.
Prevailing Wages:
The Contractor agrees to comply with all provisions of California Labor Code Sections 1771, 1775, 1776, 1777.5, 1813, and 1815
DVBE and SBE:
SBE requirements for the project are 25% | DVBE requirements for the project are 3% |
Proposals that address SBE and DVBE participation will be given special consideration. Please keep in mind prime companies must be certified at time of bid and subtiers must be certified at time of award.
Prevailing Wage/ Union Requirements:
This project does require prevailing wage but does NOT have a PLA. However, Turner Construction is signatory to the Laborers' and Carpenters' Unions. All Trade Partners/Bidders that are providing a bid for Scope of Work that would be claimed by the Laborers and Carpenters Union, will need to include Union Labor for installation.
Bid Packages Currently Bidding:
BP #03.35 | Polished Concrete |
BP #04.20 | CMU Masonry |
BP #07.50 | Roofing/Waterproofing |
BP #07.60 | Flashing & Sheet Metal |
BP #08.10 | Doors Frames and Hardware |
BP #08.33 | Overhead Doors |
BP #09.30 | Tile |
BP #09.50 | Acoustic Ceilings |
BP #09.65 | Flooring |
BP #09.90 | Painting |
BP #12.20 | Window Treatments |
BP #32.90 | Landscaping |
Turner Construction is signatory to the Carpenters and Laborers Union.
PLEASE CONTACT ANN HOANG ahoang@tcco.com IF YOU’D LIKE TO BE SENT A LINK TO BID DOCUMENTS.