ProWest Constructors

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Final Clean, Survey, SWPPP, Demolition, Hazardous Material Handling, Cast In Place Concrete, Reinforcing Steel, Sealed Concrete, Self-Leveling Underlayment, Concrete Piles, Pressure Grouting, Unit Masonry, Cleaning, Adhered Brick Veneer Masonry, Structural Steel, Metal Decking, Misc. Metals, Handrails & Railings, Cabinets & Finish Carpentry, Rough Carpentry, Flush Wood Paneling, Solid Polymer Fabrications, Water Repellents , Insulation, Air Barriers , PVC Roofing, Flashing & Sheet Metal, Roof Accessories, Joint Sealants, Hollow Metal Doors & Frames, Glass & Aluminum, Overhead Coiling Door, Door Hardware, Decorative Films, Carpet And Resilient Flooring, Drywall & Metal Stud Framing, Painting, Acoustical Ceilings, Acoustical Wall, Panels, Ceramic Tile, Resinous Flooring, Moisture Vapor Emission Control, FRP – (With Custom Graphic), Signage, Fire Extinguishers & Cabinets, Toilet & Bath Accessories, Toilet Compartments, Marker Boards, Exterior Sun Control Devices, Wall & Door Protection, Food Service Equipment, Audio Visual Equipment, Projection Screens, Stage Curtains, Window Coverings, Wheelchair Lift, Fire Suppression, Plumbing, HVAC & Controls, Electrical, Communication System, Fire Alarm System, Earthwork, Concrete Paving, Asphalt / Striping & Signage, Decorative Metal Fences & Gates/Chain Link, Landscape & Irrigation, Site Utilities


PROJECT NAME:

William S. Hart Union High School District Sierra Vista Junior High School MPR and Kitchen Modernization

BID CONTRACT #:

SV2308A

AWARDING AGENCY:

William S. Hart Union High School District

PROJECT LOCATION:

19425 W. Stillmore Street, Canyon Country, CA, 91351

BID DUE DATE:

08-24-2023 at 02:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

The project involves the modernization of an existing 8,749 SF multi-purpose building, which includes the construction of a new 1,830 SF kitchen addition. During the construction of the new kitchen, a temporary kitchen and the necessary infrastructure and site configuration will be set up. To enhance the structural integrity, pressure grouting will be completed throughout the existing slab on grade, and stage replacement with concrete piles will be implemented.

The scope of work encompasses several key areas:

  • Site Accessibility Updates: Ensuring the site meets the required accessibility standards.
  • Full Rehabilitation and Seismic Retrofit: New structural upgrades to existing building, modernization of the existing multi-purpose room and food services' servery, including upgrades to plumbing, HVAC, electrical, plumbing, fire alarm, and fire sprinklers.
  • Interior Finishes Update: Upgrading interior finishes, such as flooring, ceilings, and painting.
  • Misc. Site Work Upgrades: New concrete, curbs, landscaping and utility infrastructure upgrades.
  • Roof Replacement: Demolition of existing roof down to plywood structure for installation of new PVC roofing system.
  1. Estimated Cost: $25,000,000
  2. Project Duration: 19 Months
  3. Prevailing Wage Project
  4. All subcontractors may be required to bond over $150,000 (submit bond rate with bid)
  5. Liquidated Damages: $500 per Calendar Day
  6. Hold Bids for 90 days.