is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Final Clean, Survey, SWPPP, Demolition, Hazardous Material Handling, Cast In Place Concrete, Reinforcing Steel, Sealed Concrete, Self-Leveling Underlayment, Concrete Piles, Pressure Grouting, Unit Masonry, Cleaning, Adhered Brick Veneer Masonry, Structural Steel, Metal Decking, Misc. Metals, Handrails & Railings, Cabinets & Finish Carpentry, Rough Carpentry, Flush Wood Paneling, Solid Polymer Fabrications, Water Repellents , Insulation, Air Barriers , PVC Roofing, Flashing & Sheet Metal, Roof Accessories, Joint Sealants, Hollow Metal Doors & Frames, Glass & Aluminum, Overhead Coiling Door, Door Hardware, Decorative Films, Carpet And Resilient Flooring, Drywall & Metal Stud Framing, Painting, Acoustical Ceilings, Acoustical Wall, Panels, Ceramic Tile, Resinous Flooring, Moisture Vapor Emission Control, FRP – (With Custom Graphic), Signage, Fire Extinguishers & Cabinets, Toilet & Bath Accessories, Toilet Compartments, Marker Boards, Exterior Sun Control Devices, Wall & Door Protection, Food Service Equipment, Audio Visual Equipment, Projection Screens, Stage Curtains, Window Coverings, Wheelchair Lift, Fire Suppression, Plumbing, HVAC & Controls, Electrical, Communication System, Fire Alarm System, Earthwork, Concrete Paving, Asphalt / Striping & Signage, Decorative Metal Fences & Gates/Chain Link, Landscape & Irrigation, Site Utilities
William S. Hart Union High School District Sierra Vista Junior High School MPR and Kitchen Modernization
SV2308A
William S. Hart Union High School District
19425 W. Stillmore Street, Canyon Country, CA, 91351
08-24-2023 at 02:00 PM
Alicia Daniel
9516781038
9516781083
22710 Palomar Street, Wildomar, CA, 92595
PROJECT DETAILS:
The project involves the modernization of an existing 8,749 SF multi-purpose building, which includes the construction of a new 1,830 SF kitchen addition. During the construction of the new kitchen, a temporary kitchen and the necessary infrastructure and site configuration will be set up. To enhance the structural integrity, pressure grouting will be completed throughout the existing slab on grade, and stage replacement with concrete piles will be implemented.
The scope of work encompasses several key areas:
PDF ATTACHMENTS: