Trade Journal

Icon West, Inc

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide Demolition, Concrete, Masonry, Metals, Wood/Plastics and Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Funishings and Accessories, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Site Improvements/Utilities.


PROJECT NAME:

Canyon Charter ES - New Classroom Building/DOH Portable Replacement

BID CONTRACT #:

2310005

AWARDING AGENCY:

Los Angeles Unified School District

PROJECT LOCATION:

421 Entrada Drive, Santa Monica, CA, 90402

BID DUE DATE:

10-19-2023 at 02:00 PM

OUTREACH COORDINATOR:

Grace Hernal

TELEPHONE:

12133850027

FAX:

12133850024

ADDRESS:

520 S. La Fayette Park Place Suite# 503, Los Angeles, CA, 90057

PROJECT DETAILS:

This project is to Demolish the (E) Kindergarten & Elementary Classrooms Building then Replace with 9 Relocatable Classrooms and 2-story New Permanent Building, 17,443 SQFT, Type II-B, Group E & S2, Fully Sprinklered. located in Canyon Charter Elementary School K-5 campus. The scope of works includes but not limited to Earthworks, Concrete Slab on Grade & Footing, Structural Moment Framing System, Metal Stud Wall Framing, Hydraulic Elevator, Gypsum Board & Plaster Wall Finish, Ceramic, Vinyl, Polish & Sealed Floor Finish, PVC Roofing, including building infra structure e.g. Duct Bank to provide Power, Communications & Fire Alarm, Kitchen Hood, Building Sanitary , Landscaping & Site furnishing.

 SPECIFIC PROJECT INFORMATIONS & REQUIREMENTS: 

 1. Pursuant to Labor Code Section 1771.7, this project will be subject to the Owner approved Labor Compliance Program and Contractor and Sub-Contractors of any tier shall  pay all work performed not less than Prevailing Wages Rates and subject to compliance monitoring and enforcement and shall register with Department of Industrial Relations (DIR) of the State of California, pursuant to Labor Code Section 1771.4. as set forth in Section 00 4500 of the Bid Document.   2. Bidder is subject to the Project Stabilization Agreement ( PSA ) as described in Section 00 73 49 of the Bid Document.  3. Bidder is required to participate  in an Owner Controlled Insurance Program (OCIP) as described in Section 00 73 16 and  Article 5. Insurance & Bonds of the General Condition.  4. Any Bid listing MEP Sub-Contractors holding A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46 licenses, must be prequalified by the owner & submitted no later than September 29, 2023 and are placed on the Owner's List of Prequalified MEP Subcontractors on October 10, 2023 (Add.#4)  5. The District requires bidders to utilize only one Bid Preference provision for twenty-five (25%) for Small Business Enterprises (SBE) and five percent (5%) Veteran Business Enterprises (VBE) , and shall become LAUSD Certified prior to award as set forth in the Bid Document Section 00 73 39.   6. Each Request for Clarification shall be submitted in writing Monday, October 03, 2023 and shall be directed to Maria Castrellon via to email to maria.castrellon@lausd.net or to Icon West via email to tess@icon-west.com by using Pre-Bid Clarification form as described in Section 00 91 10.  7.  Substitution of Equivalent material, product or equipment are required to submit a written request within thirty-five (35) after Notice to Award. 8. Working Hours : Where a single shift is worked, eight (8) consecutive hours between 07:00 AM-5:00 PM , Monday to Friday .

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.