is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, concrete, structural steel, metal decking, rough carpentry, finish carpentry, casework, sheet waterproofing, insulation, metal wall panels, sheet metal, roofing, fireproofing, doors and frames, aluminum and glazing, tiling, flooring, signage, fire protection, food service equipment, water based fire suppression, plumbing, HVAC, electrical, fire alarm, communication, asphalt, paving, toilet bath and laundry accessories, survey, temporary fencing, planting and irrigation, storm drain utilities
Chaffey College - Michael Alexander Campus Center Renovation & Addition-ReBid
2023PW541
Chaffey College Community District
5885 Haven Avenue, Rancho Cucamonga, CA, 91737
05-23-2024 at 02:00 PM
Grace Hernal
12133850027
12133850024
520 S. La Fayette Park Place Suite# 503, Los Angeles, CA, 90057
PROJECT DETAILS:
'This project is to Renovate the Existing 8,227 SQFT, Michael Alexander Campus Center (MACC) and to Construct a New additional 10,845 SQFT, 1 Stories building , Type II-B , Group A-2, A-3 & B, Fully Sprinklered on North & West side of (E) MACC building for a new Dining and Food Service Space and is located at Rancho Cucamonga Campus, Chaffey College Community Center. The Scope of work includes, but not limited to new and expanded servery food options, a new cafe, 3 new dining rooms, exterior seating and gathering spaces around the building with new landscaping.
1. Pursuant to Labor Code Section 1773, The District has obtained the prevailing rate of per diem wage & the prevailing wage rate for holidays & overtime work applicable in San Bernardino County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute the contract.. 2. During the work the Department of Industrial Relations shall monitor & enforced compliance with prevailing wage rate requirements and obligations. 3. No Sub-Contractor will be awarded a Contract for Public Works, unless registered with the Department of Industrial Relations (DIR) of the State of California, pursuant to Labor Code Section 1725.5. 4. The District adopt a Disabled Veteran Business Enterprises (DVBE) three percent (3%) participation goal of the Bid proposal. 5. In accordance with Education he District is committed to includes general requirements and procedures for compliance with 2019 CALGreen nonresidential mandatory requirements, as defined on Section 01 81 50. 6. All Pre-Bid inquires or Clarification for Interpretation Request about Bid Document shall be submitted electronically to: Q&A" Section at https://pbsystem.planetbids.com/portal/43704/bo/bo-search the District's EBid System or to: tess@icon-west.com, no later than 12:00 PM, Thursday, May 02, 2024 . 7. A request for Substitution for any specific article, device, equipment, product ,material, fixtures shall be submitted no later than the Bid Due Date, as described on General Condition Section 3.11.5.3 8. Any work performed necessary to be done within regular Working Days as, 7:00 AM - 7:00 PM Monday to Friday. and Saturday 8:00 AM - 5:00 PM. Any work outside the hours of operation listed above only with the Owner's written permission .
PDF ATTACHMENTS: