Trade Journal

Edwards Construction Group

is seeking certified and qualified DVBE and SDVOSB subcontractors and/or suppliers to provide Site and Building Demolition, Concrete, Polished Concrete Finishing, Concrete Unit Masonry, Structural Steel, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Rough Carpentry, Casework and Countertops, FRP Paneling, Thermal Insulation, Spray-on Acoustical Treatment, Metal Wall & Soffit Panels, Polyvinyl-Chloride (PVC) Roofing, Sheet Metal Flashing and Trim, Access Doors and Frames, Aluminum-Framed Entrances and Storefronts, Doors,, Frames, and Hardware, Glass and Glazing, Plastering, Gypsum Board, Ceramic Tiling, Acoustical Panel & Metal Pan Ceilings, Resilient & Wood Athletic Flooring, Resilient Base and Accessories, Acoustical Wall Panels, Paintings and Coatings, Visual Display Units, Signage, Toilet Accessories & Fire Protection Specialties, Phenolic Lockers and Benches, Mobile, Storage Shelving, Gymnasium Equipment, Fall Protection System, Roller Window Shades, Bicycle Rack and Lockers, Fire Suppression, Plumbing, Heating, Ventilating, and Air Conditioning (HVAC), Testing, Adjusting, and Balancing for HVAC, Direct-Digital Control, System for HVAC, Electrical, Communications, Assistive Listening Systems, Electronic Safety and Security, Fire Alarm, Earthwork & Grading, Asphalt Paving, Synthetic Turf Surfacing for Landscaping, Chain Link, Fences and Gates, Decorative Metal Fences and Gates, Landscaping, Site Utilities


PROJECT NAME:

Bonita Vista High School Building & Site Improvements

BID CONTRACT #:

24-2884-JG

AWARDING AGENCY:

Sweetwater Union High School District

PROJECT LOCATION:

751 Otay Lakes Rd, Chula Vista, CA, 91913

BID DUE DATE:

11-06-2024 at 02:00 PM

OUTREACH COORDINATOR:

Maranda Maliska

TELEPHONE:

619-784-2704

FAX:

805-614-9909

ADDRESS:

991 Bennett Avenue, Arroyo Grande, CA, 93420

PROJECT DETAILS:

Edwards Construction Group is currently pursuing the Bonita Vista High School Building & Site Improvements project for Sweetwater Union High School District.

 

SCOPE OF WORK:Construction of a new one-story 16,437 SF Academic/Classroom Building and site improvements.

NEW CLASSROOM BUILDING PROGRAM:
• Two (2) Sports Medicine Classrooms and a Treatment Room
• Auto Shop and Auto Shop Classroom; Digital Photography Classroom
• Multimedia Studio and Classroom; Engineering Classroom; Dance Studio
• Support rooms such as Electrical, Mechanical, Telecom, Janitor and Restrooms

SITE IMPROVEMENTS:
• Removal of one (1) existing Dance Room Modular
• Relocation of one (1) existing Team Lockers Modular with ADA Path of Travel
• Quad Improvements including Landscape, Pedestrian Walks, Seating, and Shade Structures
• New Building Fencing and Gates; Access from New Building to Stadium
• Sand Volleyball Courts; Striping of New Volleyball Courts (New nets and poles) at Existing Marching Band Practice Area
• ADA drop off improvements; Miscellaneous Site Upgrades to accommodate new project construction

 

Est Construction Budget: $19,000,000

Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project. 

This is a PREVAILING WAGE project.  

There is a 3% DVBE Participation requirement.

 

There is a MEP Subcontractor Prequalification requirement. Subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered. The Prequalification application is available at the SUHSD Purchasing Website, under the Contractor Prequalification tab -AND- provided in Exhibit A of the bid documents attached. Contractor Pre-Qualification are due to Purchasing no less than 10 calendar days prior to bid opening: October 23, 2024 by 2:00 p.m.

 

There is a PROJECT STABILIZATION AGREEMENT 

(http://www.sandiegounhttp://planningandconstruction.sweetwaterschools.org/suhsd-project-labor-agreement-eff-07-11-16/)

 

BID DATE -  Tuesday, November 6th, 2:00PM PST

 

Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 10:00AM on November 6th to be considered. 

 

 

Please call if you have any questions.

 

Thank you,

 

Maranda Maliska

Estimating

Office: 619-493-3064

Fax:  805-614-9906

E-mail: EstimatingSD@edwardscongroup.com

Social Media

Copyright © 2024 Compliance News All rights reserved.