Slater & Son

is seeking certified and qualified MBE subcontractors and/or suppliers to provide Earthwork, concrete, utilities, demolition, electrical, plumbing, HVAC, roofing, paving, roofing, gypsum board, finishes, wheel chair lifts, steel, insulation, signage, food service equipment, stage curtains, metal shade structure, glazing, doors and windows, masonry, floor gratings, window shades, flooring, acoustical panel ceilings, tiling, specialties, grading, utilities, irrigation, planting, rough and finish carpentry, casework, sealants, sheet metal, metal fabrications, intrusion alarm system, structured cabling system, photovoltaic system


PROJECT NAME:

Corning Veteran's Hall Remodel

BID CONTRACT #:

24117

AWARDING AGENCY:

Board of Supervisors - County of Tehama

PROJECT LOCATION:

1620 Solano Street, Corning, CA, 96021

BID DUE DATE:

11-20-2024 at 03:00 PM

OUTREACH COORDINATOR:

Cameron Downing

TELEPHONE:

7077799376

FAX:

Not Available

ADDRESS:

3753 Morehead Avenue, Chico, CA, 95926

PROJECT DETAILS:

Scope- The project consists of a complete renovation of the interior of the existing 10,288 sqft. Corning Veteran’s Hall. Improvements will include new mechanical systems, plumbing systems, electrical systems, roofing, insulation, finishes, and kitchen equipment. Exterior improvements will include new covered entries, paving, site utilities, landscaping and a photo voltaic array.

Site Meeting- Thursday, November 7, 2024, at 10:00 a.m., on site, at 1620 Solano Street, Corning, California

Wage Rates-  Bids shall incorporate the prevailing hourly rate of per diem wages for this locality and project as determined by the Director of Industrial Relations pursuant to Labor Code Section(s) 1771, 1775, 1776, 1777.5, 1813, and 1813 a copy of which may be accessed on the Internet at http://www.dir.ca.gov/OPRL/PWD/ and is hereby made a part of this notice by reference as though fully set forth herein. When you get to this website, select “Prevailing Wage Determinations”.

Plans, specifications & addenda are available at: 
https://slaterandson.sharepoint.com/:f:/s/PreConstruction/Ei5hC97-IOBEv7QHFv6nTUQBVEziRFBxs9scFdcDRStWWg?e=JHxExB

or can be purchased at Metagraphics, Chico (530) 343-3004. 

Alternates: None

Estimated Start Date: 01/2025

Estimated Project Duration (CD): 300

Estimated start date and project duration are subject to change.

All questions must be submitted on or before Monday 11/11/2024 at 5:00 PM, in writing, via email to Kyle Matti at matti@NMRDesign.com

Subcontractors can submit proposals on or before Wednesday 11/20/2024 @ 12:00 pm.

Submit your Proposal & Scope letter to jim@slaterandson.com

Note your DIR # and CSLB # on your proposal.

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.