is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Trades including, but not limited to; site demo, survey, concrete, concrete sealer, masonry, structural steel framing, metal fabrications, rough carpentry, finish carpentry, casework, countertops, batt & rigid insulation, weather barriers, metal roofing, sheet metal, firestopping, joint sealants, HM doors & frames, P-lam wood doors, access doors, aluminum-framed entrances & storefronts, door hardware, glazing, louvers, drywall, plaster, tiling, acoustical ceiling panels, resilient flooring ("Interface-Norament"), rubber base, tackable wall panels, paint, epoxy paint, markerboards, electronic displays, signage, corner guards, toilet accessories, fire extinguishers, laboratory fume hoods, window coverings, laboratory worksurfaces, fire sprinklers, plumbing, HVAC, electrical, low voltage, Communications, audio/visual, fire alarm, earthwork, landscape & irrigation, asphalt, chain link fences & gates, UG utilities.
Gridley High School - Science Classroom Building
23-2064
Gridley Unified School District
300 E Spruce St, Gridley, CA, 95948
12-19-2024 at 02:00 PM
Paige James
(530) 894-6859
(530) 894-6061
855 Marauder St. Ste 100, Chico, CA, 95973
PROJECT DETAILS:
All Subcontractors are required to acknowledge and meet the minimum insurance requirements set forth by the owner in the project plans, specifications and addenda. *All Subcontractors will be responsible for any wage determination increases that may arise over the course of the project. *Ginno Construction relies on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. *Ginno Construction’s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. *All Subcontractors must sign and abide by their contract with Ginno Construction, Inc.*All Subcontractors with a bid that exceeds $500,000 must include a bid bond & performance bond as a separate line item cost
PDF ATTACHMENTS: