Trade Journal

Ginno Construction

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Trades including, but not limited to; site demo, survey, concrete, concrete sealer, masonry, structural steel framing, metal fabrications, rough carpentry, finish carpentry, casework, countertops, batt & rigid insulation, weather barriers, metal roofing, sheet metal, firestopping, joint sealants, HM doors & frames, P-lam wood doors, access doors, aluminum-framed entrances & storefronts, door hardware, glazing, louvers, drywall, plaster, tiling, acoustical ceiling panels, resilient flooring ("Interface-Norament"), rubber base, tackable wall panels, paint, epoxy paint, markerboards, electronic displays, signage, corner guards, toilet accessories, fire extinguishers, laboratory fume hoods, window coverings, laboratory worksurfaces, fire sprinklers, plumbing, HVAC, electrical, low voltage, Communications, audio/visual, fire alarm, earthwork, landscape & irrigation, asphalt, chain link fences & gates, UG utilities.


PROJECT NAME:

Gridley High School - Science Classroom Building

BID CONTRACT #:

23-2064

AWARDING AGENCY:

Gridley Unified School District

PROJECT LOCATION:

300 E Spruce St, Gridley, CA, 95948

BID DUE DATE:

12-19-2024 at 02:00 PM

OUTREACH COORDINATOR:

Paige James

TELEPHONE:

(530) 894-6859

FAX:

(530) 894-6061

ADDRESS:

855 Marauder St. Ste 100, Chico, CA, 95973

PROJECT DETAILS:

All Subcontractors are required to acknowledge and meet the minimum insurance requirements set forth by the owner in the project plans, specifications and addenda. *All Subcontractors will be responsible for any wage determination increases that may arise over the course of the project. *Ginno Construction relies on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. *Ginno Construction’s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. *All Subcontractors must sign and abide by their contract with Ginno Construction, Inc.*All Subcontractors with a bid that exceeds $500,000 must include a bid bond & performance bond as a separate line item cost

Social Media

Copyright © 2024 Compliance News All rights reserved.